Contractor · Plumbing
LANDIS & LANDIS CONSTRUCTION LLC
26 building permits since 2022 in Forest Grove city, OR and Tualatin city, OR — $19,821,883 in reported job value over 26 permits that state one.
- Building permits
- 26
- Reported job value
- $19.8M
- Active
- 2022–2026
- Latest permit
- Oct 27, 2026
Where it works
Counties shaded by permits filed there.
Busiest jurisdictions
- Forest Grove city, OR19
- Tualatin city, OR7
Permits by year
By issue date (application date where there is none).
01020
19
202220232026*
View as tableHide table
| Year | Permits |
|---|---|
| 2022 | 4 |
| 2023 | 3 |
| 2026 (YTD) | 19 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Plumbing20
- Remodels18
- Grading & excavation2
Permit types
As the building departments classify them.
- Residential Plumbing17
- RETAINING WALL - RESIDENTIAL 1 AND 23
- Commercial Plumbing2
- EROSION CONTROL - 1200C DISTURBING OVER 5 ACRES1
- EROSION CONTROL - NON-RESIDENTIAL DISTURBING UNDER 1 ACRE1
- TEMPORARY WATER SERVICE - 3 INCH FIRE HYDRANT METER1
- WATER QUALITY - PRIVATE1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Oct 27, 2026 | Residential Plumbing | Forest Grove Sewer Rehabilitating existing sewer line to 4" HDPE pipe burst. Installing private clean out. | Forest Grove | — |
| Oct 21, 2026 | Residential Plumbing | Forest Grove Sewer Rehab 6 inch pipe burst existing lateral from the ML to the Private property 5 feet from the house. | Forest Grove | — |
| Oct 21, 2026 | Residential Plumbing | Forest Grove Sewer Rehabilitating existing 4 inch sewer with 4" HDPE pipe burst from mainline to the private property and installing a clean out. | Forest Grove | — |
| Oct 21, 2026 | Residential Plumbing | Forest Grove Sewer Rehabilitating existing 6" sewer lateral with 6" HDPE pipe burst and installing a clean out. | Forest Grove | — |
| Oct 21, 2026 | Residential Plumbing | Forest Grove Sewer Rehabilitating existing 6" sewer lateral with 6" HDPE pipe burst and installing a clean out. | Forest Grove | — |
| Oct 21, 2026 | Residential Plumbing | Forest Grove Sewer Rehabilitating existing 4" sewer lateral with 4" HDPE pipe burst and installing a clean out. | Forest Grove | — |
| Oct 21, 2026 | Residential Plumbing | Forest Grove Sewer Rehabilitating existing 6" sewer lateral with 6" HDPE pipe burst and installing a clean out. | Forest Grove | — |
| Oct 21, 2026 | Residential Plumbing | Forest Grove Sewer Rehabilitating existing 4" sewer lateral with 4" HDPE pipe burst connect to 4" open from mainline to ROW and installing a private clean out. | Forest Grove | — |
Permit status
Where its permits stand, as the departments report them.
- Finaled19
- Issued6
- Completed1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.