Contractor · Electrical

Hometown Electric LLC

26 building permits since 2019 in Gaston County, NC — $361,900 in reported job value over 3 permits that state one.

Building permits
26
Reported job value
$361.9K
Active
2019–2026
Latest permit
Jul 13, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Gaston County, NC26

Permits by year

By issue date (application date where there is none).

048
7
2020202220242026*
* 2026 is year to date.
View as table
YearPermits
20193
20201
20211
20224
20233
20241
20257
2026 (YTD)6

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical19
  • HVAC12
  • Heat pumps8
  • Gas3
  • Electric meters2
  • New construction2
  • Additions1

Permit types

As the building departments classify them.

  • Single Trade (Residential) - Electrical11
  • HVAC Change Out - Electrical7
  • HVAC Change Out - Gas3
  • Addition (Residential)1
  • Building Permit Request: Residential Accessory Structure1
  • Modular Home (Residential)1
  • New Single-Family Home (Residential)1
  • ZN - New Construction – Single Family Residential1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Jul 13, 2026Single Trade (Residential) - Electricalservice changeGaston County—
Apr 29, 2026HVAC Change Out - ElectricalChangeout existing heat pump with new heat pump.Gaston County—
Apr 28, 2026Single Trade (Residential) - ElectricalWire Mini SplitGaston County—
Apr 14, 2026HVAC Change Out - GasChangeout existing gas furnace and A/C with new Gas furnace and A/CGaston County—
Feb 27, 2026HVAC Change Out - ElectricalHeat Pump Change OutGaston County—
Feb 27, 2026HVAC Change Out - GasGas Furnace Change OutGaston County—
Dec 9, 2025HVAC Change Out - Gasreplacing a gas packGaston County—
Aug 15, 2025Single Trade (Residential) - ElectricalReplace breaker box. Resident had no power. I have talked to the inspector.Gaston County—

Permit status

Where its permits stand, as the departments report them.

  • Completed17
  • Cancelled4
  • Issued3
  • Void2

Also on file as

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.