Contractor · Electrical
GREEN ELECTRIC INC
26 building permits since 2004 in Brookline town, MA; Lynnfield town, MA and Medway town, MA, across 5 counties — $9,300 in reported job value over 2 permits that state one.
- Building permits
- 26
- Reported job value
- $9.3K
- Active
- 2004–2025
- Latest permit
- Nov 6, 2025
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Brookline town, MA12
- Lynnfield town, MA4
- Medway town, MA4
- Westford town, MA2
- Dartmouth town, MA1
- Ludlow town, MA1
- Somerville city, MA1
- Walpole town, MA1
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2004 | 3 |
| 2007 | 1 |
| 2013 | 5 |
| 2017 | 2 |
| 2019 | 1 |
| 2020 | 1 |
| 2021 | 3 |
| 2022 | 3 |
| 2023 | 1 |
| 2024 | 1 |
| 2025 | 5 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Electrical21
- Remodels3
- HVAC2
- Heat pumps1
Permit types
As the building departments classify them.
- Commercial Electrical11
- Munis Permit4
- Electrical Permit3
- Other3
- ELECT.1
- Electrical Permit RESIDENTIAL One and Two Family1
- Residential Electrical1
- Tenant Fit Up1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Nov 6, 2025 | Commercial Electrical | James E Green Install 200 amp panel on exisitng feeder Install lighting and receptacles Wire walk in cooler | Brookline Town | — |
| Oct 7, 2025 | Commercial Electrical | James E Green Starbucks Make safe equipment | Brookline Town | — |
| Oct 7, 2025 | Commercial Electrical | James Green STARBUCKS Make Safe of equipment and counters for Starbucks store closing | Brookline Town | — |
| Apr 25, 2025 | Commercial Electrical | James Green STARBUCKS: Wire new Mini split. Disconnect and reconnect roof top unit. | Brookline Town | — |
| Mar 20, 2025 | Residential Electrical | James Green Replace 4 smoke detector replace 1-co detector install1-new smoke detector all 110 volt interconnected All existing wiring. | Brookline Town | — |
| Aug 13, 2024 | Commercial Electrical | James Green Install CO2 in garage when activated turns on exhaust fans | Brookline Town | — |
| Aug 22, 2023 | Commercial Electrical | James Green Bloomingdales Mens (nespresso) first floor Install lighting and power, install underground for cash wrap | Brookline Town | — |
| Jun 9, 2022 | Commercial Electrical | James Green Install 5 blower heaters and 1 heat bank | Brookline Town | — |
Permit status
Where its permits stand, as the departments report them.
- Closed9
- Issued9
- Additional information required4
- Completed2
- Active1
- Withdrawn1
Also on file as
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.