Contractor · Electrical

Robert Plouff

329 building permits since 2012 in Barrington town, RI; Pawtucket city, RI and Providence city, RI, across 5 counties — $2,074,560 in reported job value over 300 permits that state one.

Building permits
329
Reported job value
$2.1M
Active
2012–2026
Latest permit
Oct 16, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Barrington town, RI138
  • Pawtucket city, RI23
  • Providence city, RI23
  • East Providence city, RI21
  • Bristol town, RI17
  • Woonsocket city, RI14
  • Lincoln town, RI11
  • Narragansett town, RI11
  • Warwick city, RI10
  • North Kingstown town, RI10

Permits by year

By issue date (application date where there is none).

02550
44
20132017202020232026*
* 2026 is year to date.
View as table
YearPermits
20121
20131
20141
20151
20179
201826
201934
202041
202133
202239
202332
202434
202544
2026 (YTD)33

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical328
  • Bathrooms51
  • Kitchens48
  • Pools & hot tubs45
  • Additions30
  • Electric meters23
  • HVAC22
  • Generators17
  • New construction11
  • Remodels6

Permit types

As the building departments classify them.

  • Electrical Permit322
  • 2) Electrical Permit6
  • Building Permit1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Oct 16, 2026Electrical PermitRemove old wiring and lights, replace lights and rewire garageProvidence City$4,500
Sep 28, 2026Electrical PermitWire new outdoor kitchen. Run new power to garage and shed. Replace out side lightsBristol Town$5,000
Sep 25, 2026Electrical PermitReplace old 150 service with 200amp wire new addition 2nd floorBarrington Town$12,000
Sep 25, 2026Electrical PermitWire new additions 1st /2nd floors rewire whole house wire A/C , disconnect generator and reconnectEast Providence City$15,000
Sep 11, 2026Electrical PermitUpgrade service 100 to 200 amps and finish wiring the pooBarrington Town$6,500
Aug 25, 20262) Electrical PermitReplace underground service from meter socket to handwhole 200 ampsCranston City$4,500
Aug 14, 2026Electrical PermitReplace all old lighfixters with new LED lights. Replace all plugs and switches add plugs and switches to new office building permit # B-26-415 2nd half of builNorth Providence Town$40,000
Aug 3, 2026Electrical PermitUnscrew meter socket from house side behind and rescrew meter and cable back to houseNorth Smithfield Town$1,000

Permit status

Where its permits stand, as the departments report them.

  • Completed244
  • Active69
  • Stop work ordered16

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.