Contractor · Electrical
David Volpe
26 building permits since 2019 in Boston city, MA; Lexington town, MA and Andover town, MA, across 4 counties — $4,255,050 in reported job value over 23 permits that state one.
- Building permits
- 26
- Reported job value
- $4.3M
- Active
- 2019–2025
- Latest permit
- Oct 1, 2025
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Boston city, MA8
- Lexington town, MA3
- Andover town, MA2
- Acton town, MA2
- Concord town, MA2
- Canton town, MA2
- Quincy city, MA2
- Beverly city, MA1
- Gloucester city, MA1
- Newburyport city, MA1
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2019 | 3 |
| 2020 | 4 |
| 2021 | 6 |
| 2022 | 3 |
| 2023 | 7 |
| 2025 | 3 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Electrical22
- HVAC4
- Remodels3
- Additions2
- New construction1
Permit types
As the building departments classify them.
- Electrical Permit10
- ELECTRICAL7
- Building Permit2
- ELECT.2
- Electrical2
- Electrical Permit - Commercial1
- FA1
- Fire Alarm (Residential/Commercial) Permit1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Oct 1, 2025 | Electrical Permit | Replacement of distribution and fire alarm equipement effected by water leak from floor above. Total is (4) panelboards and (1) main distribution panel. (1) fir | Littleton Town | $95,000 |
| Jun 6, 2025 | Building Permit | Relocation of existing horn strobe/pull station. | Andover Town | $5,000 |
| Jan 6, 2025 | Electrical Permit | Chiller # 1 & 3 replacement and associated pumps. | Beverly City | $42,000 |
| Dec 19, 2023 | Electrical Permit | — | Newburyport City | $98,500 |
| Oct 3, 2023 | Electrical Permit | Complete renovation of old K-Mart. New 2500A service for main store and additional 1600A service for tenant space. Provisions for general power, owner equipment | Acton Town | $1,850,000 |
| Sep 26, 2023 | Electrical Permit | Installation of (2) floor poke throughs and (2) general use receptacles. Re-work lighting to new floor plan. | Acton Town | $9,500 |
| Aug 15, 2023 | Electrical Permit - Commercial | — | Marlborough City | $9,000 |
| May 30, 2023 | Electrical Permit | Replacement of MRI. Replacement of enclosed circuit breaker and EPO switch. New Wiremold for MRI control wiring. | Gloucester City | $22,000 |
Permit status
Where its permits stand, as the departments report them.
- Active11
- Completed10
- Closed3
- Issued2
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.