Contractor · Electrical

DAVID DELORENZO

26 building permits since 2022 in Buffalo city, NY — $76,653 in reported job value over 26 permits that state one.

Building permits
26
Reported job value
$76.7K
Active
2022–2026
Latest permit
Oct 14, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Buffalo city, NY26

Permits by year

By issue date (application date where there is none).

07.515
12
2022202320252026*
* 2026 is year to date.
View as table
YearPermits
20221
20232
202511
2026 (YTD)12

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical26
  • Electric meters12
  • EV chargers6
  • Kitchens2
  • Bathrooms2
  • HVAC1
  • Battery storage1
  • Remodels1
  • Additions1

Permit types

As the building departments classify them.

  • ELECTRICAL26

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Oct 14, 2026ELECTRICALInstall new switch and light box at stairs. Install AFCI breaker.Buffalo City$1,500
Oct 14, 2026ELECTRICALInstall receptacles and lighting in new addition. Install subpanel for new circuits with ACFI breakers.Buffalo City$6,000
Oct 6, 2026ELECTRICALNational Grid required reinspection of house to reinstate power and release meters. Installed basement smoke/CO2 detector, missing cover plates, missing basemenBuffalo City$700
Sep 8, 2026ELECTRICALUpgrade existing electrical service to 150A. New SE cable, meter socket, panel, breakers and grounding.Buffalo City$3,500
Jul 22, 2026ELECTRICALReplace existing electrical service with new 2 meter 200A service. Install new SE cable meter channel with two disconnects and relocate meters to exterior of hoBuffalo City$5,000
May 22, 2026ELECTRICALInstall a Ford hardwired EV charger at outside of house. Feed from existing 200a MB panel. EV charger rated 48A 240V. 11.5 KW.Buffalo City$1,900
Apr 3, 2026ELECTRICALRewire existing bedroom and bathroom spaces.Buffalo City$4,000
Mar 29, 2026ELECTRICAL200A service upgrade, 2 meters with main disconnects. 2 new 100A panels update grounding.Buffalo City$7,500

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.

DAVID DELORENZO — Building Permits & Contractor Profile | Buildstats