Contractor · Specialty (solar, fire, telecom)
BRIGHT ENERGY GROUP LLC
26 building permits since 2023 in Marin County, CA; Los Altos Hills town, CA and Merced city, CA, across 10 counties — $1,097,971 in reported job value over 20 permits that state one.
- Building permits
- 26
- Reported job value
- $1.1M
- Active
- 2023–2026
- Latest permit
- Feb 26, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Marin County, CA4
- Los Altos Hills town, CA4
- Merced city, CA3
- Elk Grove city, CA2
- Mountain View city, CA2
- San Pablo city, CA2
- Alameda city, CA1
- Burbank city, CA1
- Yuba County, CA1
- Concord city, CA1
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2023 | 5 |
| 2024 | 8 |
| 2025 | 8 |
| 2026 (YTD) | 5 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Solar22
- Battery storage13
- Electrical6
- Plumbing4
- HVAC3
- Roofing3
- Water heaters2
Permit types
As the building departments classify them.
- Electrical4
- RESIDENTIAL4
- BUILDING REQUEST2
- BUILDING/SOLAR2
- ONLINE SOLAR PHOTOVOLTAIC PERMITS2
- PHOTOVOLTAIC SYSTEMS2
- SOLAR PHOTOVOLTAIC2
- BL, CH, EL1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Feb 26, 2026 | Electrical | The inspector said we need the load calculation form reviewed and approved for this solar permit: b253883 | Concord City | — |
| Feb 20, 2026 | Electrical | Roof mount pv - 4.51 kw, 11 modules, ess | Morgan Hill City | — |
| Feb 6, 2026 | Solar Permit (Roof) - Single Family | — | Yuba County | — |
| Jan 7, 2026 | Electrical | Residential - single family: instant permit for pv panels only with a 5.28 kw-ac pv rating. | Palo Alto City | — |
| Jan 7, 2026 | Electrical | Solar roof mount 9.24 kw, 21 solar panels, 2 batteries | Alameda City | — |
| Dec 15, 2025 | RESIDENTIAL | Solar roof mount 115.8 KW, 181 solar panels, 20 batteries | Marin County | $70,000 |
| Nov 10, 2025 | EL | SOLARAPP+ SA20251110-5854-162-10765-A INSTALL ROOFTOP PHOTOVOLTAIC SYSTEM (4.2KW) & (1) ENERGY STORAGE SYSTEM (8.51KWH) | Mountain View City | $1,000 |
| Oct 13, 2025 | Single Family | 4.8kw Solar PV System, 13.5 kw PV Storage System Size and 0gal Solar WH System (water heater installed null). REVISION RES-2522877- ADDED 7 PANELS. SOLAR ROOF M | Sacramento | $36,977 |
Permit status
Where its permits stand, as the departments report them.
- Not stated10
- Finaled6
- Issued4
- Active2
- Closed2
- Completed2
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.