Contractor · General building
Andrew Tower
26 building permits since 2017 in Providence city, RI; North Kingstown town, RI and East Greenwich town, RI, across 3 counties — $2,360,000 in reported job value over 23 permits that state one.
- Building permits
- 26
- Reported job value
- $2.4M
- Active
- 2017–2026
- Latest permit
- Jul 16, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Providence city, RI21
- North Kingstown town, RI3
- East Greenwich town, RI1
- Cranston city, RI1
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2017 | 1 |
| 2018 | 5 |
| 2019 | 2 |
| 2021 | 1 |
| 2022 | 3 |
| 2023 | 4 |
| 2024 | 2 |
| 2025 | 5 |
| 2026 (YTD) | 3 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Kitchens11
- Remodels11
- Bathrooms10
- Windows & doors9
- Demolition8
- Electrical7
- HVAC6
- Plumbing6
- Roofing4
- Additions4
Permit types
As the building departments classify them.
- Building Permit20
- 1) Building Permit1
- Demolition Permit1
- EG Building Permit1
- Electrical Permit1
- Fire Alarm Permit1
- Roofing Permit1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Jul 16, 2026 | Building Permit | This is a tenant fit out. The space was renovated partially around 7 years ago with rough MEP, and bathroom rough ins. This will be the finish buildout for a bu | Providence City | $45,000 |
| Feb 20, 2026 | Building Permit | We are in the process of fixing up the facade of the building. There were originally awnings on the front and two sides of this structure. We will be installing | Providence City | $5,000 |
| Feb 18, 2026 | Building Permit | This is a renovation and small addition to an existing house. The addition involves removing an existing sunroom which is in disrepair, and in it's place, build | Providence City | $300,000 |
| Jul 24, 2025 | Building Permit | This is the full building permit following up a previous demo permit. We have done a partial gut of the house to expose most framing and MEP. We are doing some | Providence City | $375,000 |
| May 28, 2025 | Building Permit | This is a follow up "full" building permit after an initial "demo only" permit. We are doing a selective gut renovation of the existing structure and adding a s | Providence City | $350,000 |
| Apr 7, 2025 | Building Permit | We will be doing a partial gut renovation. This will ultimately include renvation of kitchen and bathrooms, some changes to room enclosures, some replacement of | Providence City | $13,000 |
| Apr 7, 2025 | Building Permit | This permit is for DEMOLITION ONLY. We are in the process of redesigning the interior of the house and doing some space planning. Owners want to see the spaces | Providence City | $15,000 |
| Mar 31, 2025 | Building Permit | The main floor tenant space (unit 01) which has been built out for childcare facility. This space is self contained, has it's own means of egress (two directly | Providence City | $80,000 |
Permit status
Where its permits stand, as the departments report them.
- Active12
- Completed11
- Stop work ordered3
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.