Contractor · General building

Andrew Tower

26 building permits since 2017 in Providence city, RI; North Kingstown town, RI and East Greenwich town, RI, across 3 counties — $2,360,000 in reported job value over 23 permits that state one.

Building permits
26
Reported job value
$2.4M
Active
2017–2026
Latest permit
Jul 16, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Providence city, RI21
  • North Kingstown town, RI3
  • East Greenwich town, RI1
  • Cranston city, RI1

Permits by year

By issue date (application date where there is none).

02.55
5
20172019202220242026*
* 2026 is year to date.
View as table
YearPermits
20171
20185
20192
20211
20223
20234
20242
20255
2026 (YTD)3

Type of work

Permits describing each kind of work; one permit can cover several.

  • Kitchens11
  • Remodels11
  • Bathrooms10
  • Windows & doors9
  • Demolition8
  • Electrical7
  • HVAC6
  • Plumbing6
  • Roofing4
  • Additions4

Permit types

As the building departments classify them.

  • Building Permit20
  • 1) Building Permit1
  • Demolition Permit1
  • EG Building Permit1
  • Electrical Permit1
  • Fire Alarm Permit1
  • Roofing Permit1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Jul 16, 2026Building PermitThis is a tenant fit out. The space was renovated partially around 7 years ago with rough MEP, and bathroom rough ins. This will be the finish buildout for a buProvidence City$45,000
Feb 20, 2026Building PermitWe are in the process of fixing up the facade of the building. There were originally awnings on the front and two sides of this structure. We will be installingProvidence City$5,000
Feb 18, 2026Building PermitThis is a renovation and small addition to an existing house. The addition involves removing an existing sunroom which is in disrepair, and in it's place, buildProvidence City$300,000
Jul 24, 2025Building PermitThis is the full building permit following up a previous demo permit. We have done a partial gut of the house to expose most framing and MEP. We are doing some Providence City$375,000
May 28, 2025Building PermitThis is a follow up "full" building permit after an initial "demo only" permit. We are doing a selective gut renovation of the existing structure and adding a sProvidence City$350,000
Apr 7, 2025Building PermitWe will be doing a partial gut renovation. This will ultimately include renvation of kitchen and bathrooms, some changes to room enclosures, some replacement ofProvidence City$13,000
Apr 7, 2025Building PermitThis permit is for DEMOLITION ONLY. We are in the process of redesigning the interior of the house and doing some space planning. Owners want to see the spaces Providence City$15,000
Mar 31, 2025Building PermitThe main floor tenant space (unit 01) which has been built out for childcare facility. This space is self contained, has it's own means of egress (two directly Providence City$80,000

Permit status

Where its permits stand, as the departments report them.

  • Active12
  • Completed11
  • Stop work ordered3

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.