Contractor · Demolition & excavation
THE WALSH GROUP
27 building permits since 2021 in Tacoma city, WA — $233,000 in reported job value over 5 permits that state one.
- Building permits
- 27
- Reported job value
- $233K
- Active
- 2021–2023
- Latest permit
- Mar 22, 2023
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Tacoma city, WA27
Permits by year
By issue date (application date where there is none).
01020
17
202120222023
View as tableHide table
| Year | Permits |
|---|---|
| 2021 | 8 |
| 2022 | 17 |
| 2023 | 2 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Demolition5
- Plumbing2
- HVAC1
- Grading & excavation1
- Electrical1
Permit types
As the building departments classify them.
- Site21
- Building5
- Utility Connection1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Mar 22, 2023 | Site | Walsh crews will be performing nighttime punchlist items from 7th and Commerce up to MLK and 19th St. The punchlist activities that are not limited to are jetti | Tacoma City | — |
| Jan 24, 2023 | Site | Walsh will be performing punchlist corrective work along the entirety of the alignment from 7thCommerce up to MLK18th St. This will consist of track slab repair | Tacoma City | — |
| Dec 15, 2022 | Site | Walsh and WE Coates will be working at night to install survey monuments along the entire alignment | Tacoma City | — |
| Nov 14, 2022 | Site | Liberty Electric and Walsh will be performing SIT Tests 103 and 201 for the LRV train. Tests will consist of towing train (round trip) from 7thCommerce Station | Tacoma City | — |
| Nov 3, 2022 | Site | Walsh will be performing upcoming work at the corner of N 1st St. and N Yakima Ave. The will be for the vaulted sidewalk repair. At the NE Corner of N 1st St. a | Tacoma City | — |
| Nov 3, 2022 | Site | Elliott Bay Metal Fabrication have been working on installing station handrails on all the 7 stations. This noise variance request is for when work will be perf | Tacoma City | — |
| Oct 19, 2022 | Site | The Walsh Group will be performing Civil Flatwork and Paving Operations at N 1st and Tacoma Ave from 102922 to 122322 from 7am to 5pm Monday through Sunday. | Tacoma City | — |
| Oct 18, 2022 | Site | Operation of rail grinding machine for removal of rail surface defectscorrugation, improving transverse rail profile, improving conditions at wheelrail interfac | Tacoma City | — |
Permit status
Where its permits stand, as the departments report them.
- Closed17
- Cancelled5
- Finaled3
- Void2
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.