27 building permits since 2008 in Boulder city, CO and Boulder County, CO — $2,153,788 in reported job value over 27 permits that state one.
- Building permits
- 27
- Reported job value
- $2.2M
- Active
- 2008–2011
- Latest permit
- May 20, 2011
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Boulder city, CO19
- Boulder County, CO8
Permits by year
By issue date (application date where there is none).
07.515
11
2008200920102011
View as tableHide table
| Year | Permits |
|---|---|
| 2008 | 4 |
| 2009 | 7 |
| 2010 | 5 |
| 2011 | 11 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Solar26
- Electrical26
- Roofing2
Permit types
As the building departments classify them.
- Electrical Permit19
- Solar Electrical System7
- Wind Turbine1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| May 20, 2011 | Wind Turbine | Wind Turbine | Boulder County | $16,000 |
| Apr 12, 2011 | Electrical Permit | Installation of a flush-mount grid-tie 3.15 kW photovoltaic system -- array to remain below ridge, inside of rakes and above eave. See engineer's letter for spe | Boulder | $16,770 |
| Apr 12, 2011 | Electrical Permit | Installation of a 5.6 kW photovoltaic system -- most of array to be flush mounted, with a three panels being installed ina tilt-up layout. See engineer's letter | Boulder | $31,941 |
| Mar 9, 2011 | Electrical Permit | Installation of a 42.09 kW solar array, 127 flush mounted modules and 56 modules tilted at 10.3 degrees. | Boulder | $189,482 |
| Mar 2, 2011 | Solar Electrical System | Solar PV System 16.2KW Flush Roof Mounted, Grid Tied on Structure | Boulder County | $129,600 |
| Feb 18, 2011 | Solar Electrical System | SOLAR PV SYSTEM 9.87KW FLUSH ROOF MOUNTED, GRID TIED on RESIDENCE | Boulder County | $78,960 |
| Feb 17, 2011 | Electrical Permit | Installation of a 53 kW photovoltaic solar array. Array panels tilted at 10 degrees, but to remain below the top of the existing parapet wall, shadows of array | Boulder | $240,000 |
| Feb 1, 2011 | Electrical Permit | Installation of 3.6 kw rooftop solar photovoltaic system on condo unit per approval of ADR2011-00002. | Boulder | $22,000 |
Permit status
Where its permits stand, as the departments report them.
- Completed19
- Closed7
- Issued1