Contractor · Electrical

SANTA CRUZ COUNTY PROBATIONSANTA CRUZ COUNTY OF

27 building permits since 2013 in Santa Cruz County, CA.

Building permits
27
Reported job value
—
Active
2013–2026
Latest permit
Aug 26, 2026

Where it works

Counties shaded by permits filed there.

Permits by county, fewer to more

Busiest jurisdictions

  • Santa Cruz County, CA27

Permits by year

By issue date (application date where there is none).

048
7
2013202020222026*
* 2026 is year to date.
View as table
YearPermits
20131
20172
20204
20213
20224
20257
2026 (YTD)6

Type of work

Permits describing each kind of work; one permit can cover several.

  • Telecom10
  • Electrical7
  • Grading & excavation5
  • Battery storage4
  • Generators3
  • Gas2
  • HVAC2
  • Kitchens2
  • Remodels2
  • Roofing2

Permit types

As the building departments classify them.

  • Building27

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Aug 26, 2026BuildingModification to existing T-Mobile wireless facility. Electrical work only. Permit to include disconnect (E) conduit and conductors from utility POC to (E) meterSanta Cruz County—
Aug 4, 2026BuildingConstruction Change Document #2 to Permit B-175374 to include following: Changes to Mechanical / Electrical / Plumbing. 1) Mech: Updated air-cooled chiller to aSanta Cruz County—
Jul 23, 2026BuildingConstruction Change Document #3 to Permit B-175374 to include following: It has been determined that the roof slab is NOT 9' Hollow core. The roof slab is 11" cSanta Cruz County—
Jun 4, 2026BuildingModifications to existing AT&T cell site: Install (3) new antenna on existing monopole.Santa Cruz County—
May 6, 2026BuildingT-Mobile Wireless Cell Site: Replace (E) LED battery on (E) equipment cabinet with (8) new lithium-ion batteries.Santa Cruz County—
Jan 14, 2026BuildingWINTER GRADING APPROVAL DISC131090 Install a prefabricated 6,810 SF multi-use recreational building at the Santa Cruz County Juvenile Hall. Grading to include 3Santa Cruz County—
Dec 22, 2025BuildingDeferred Submittal # 1 to building permit B-175374 to include following: Fiber reinforced polymer coating to roof.Santa Cruz County—
Dec 8, 2025Building**OWNER TO ADDRESS VOIDED PERMIT B-191527, B-211892 and 0049583M-00137178 . NO FINAL INSPECTION WILL BE DONE ON THIS PERMIT UNTIL THE VOIDED PERMIT IS FINALIZEDSanta Cruz County—

Permit status

Where its permits stand, as the departments report them.

  • Completed16
  • Active8
  • Reviews complete2
  • Additional information required1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.