Contractor · Electrical
QUALITY ELECTRIC SERVICE INC
27 building permits since 2022 in Arlington County, VA.
- Building permits
- 27
- Reported job value
- —
- Active
- 2022–2026
- Latest permit
- Sep 16, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Arlington County, VA27
Permits by year
By issue date (application date where there is none).
048
7
20222023202420252026*
View as tableHide table
| Year | Permits |
|---|---|
| 2022 | 3 |
| 2023 | 7 |
| 2024 | 7 |
| 2025 | 6 |
| 2026 (YTD) | 4 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Electrical27
- Gas6
- EV chargers2
- Bathrooms1
- Electric meters1
Permit types
As the building departments classify them.
- Electrical27
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Sep 16, 2026 | Electrical | Install 200-amp panel and 200 amp disconnect switch to replace existing. 50-amp 240-volt circuit for cooktop. Add outside outlet. | Arlington County | — |
| May 27, 2026 | Electrical | Replace main electric panel with new 200-amp main breaker panel. Add 200 amp outdoor disconnect. | Arlington County | — |
| Feb 26, 2026 | Electrical | Replace panel with new 200-amp panel and install 200 amp outdoor disconnect per code. | Arlington County | — |
| Feb 13, 2026 | Electrical | Replace 200 amp panel with new 200 amp panel and 200 amp disconnect. | Arlington County | — |
| Sep 25, 2025 | Electrical | Install outlet in fireplaces (2) for new gas insert installed by others. | Arlington County | — |
| Aug 29, 2025 | Electrical | Install AFCI protected outlet in fireplace for new gas insert install by others. | Arlington County | — |
| May 19, 2025 | Electrical | New circuit and GFI outlet for sump pump. | Arlington County | — |
| Mar 25, 2025 | Electrical | Outlet in Fireplace for gas insert installed by others. | Arlington County | — |
Also on file as
The same name elsewhere
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.