Contractor · Specialty (solar, fire, telecom)
OC Solar
27 building permits since 2023 in Cypress city, CA; Thousand Oaks city, CA and Riverside County, CA, across 4 counties — $43,740 in reported job value over 2 permits that state one.
- Building permits
- 27
- Reported job value
- $43.7K
- Active
- 2023–2026
- Latest permit
- Mar 24, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Cypress city, CA10
- Thousand Oaks city, CA8
- Riverside County, CA4
- Norwalk city, CA4
- Agoura Hills city, CA1
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2023 | 8 |
| 2024 | 2 |
| 2025 | 4 |
| 2026 (YTD) | 13 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Solar23
- Roofing15
- Electrical11
- Battery storage6
- EV chargers2
Permit types
As the building departments classify them.
- Electrical11
- Solar Residential Rooftop Permit8
- Solar Permit4
- Roofing2
- Reroof Permit1
- SolarAPP+ Solar Permit1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Mar 24, 2026 | Electrical | Install (4.92kw dc) solar pv & (13.5kwh) ess system: (12) roof-mounted hanwa qcells (410w) solar modules w/ (12) enphase iq microinverters on (2) strings; (1) t | Agoura Hills City | — |
| Mar 11, 2026 | Electrical | New roof mounted solar - 7.82kw - 17 mods - 1 inverter with ess - 1 dc expansion pack | Riverside County | — |
| Feb 25, 2026 | Electrical | New roof mounted solar add on system - 3.52kw - 1 inverter - new 125a subpanel. Rev b 2/25/26 approved per solar app + revision 3/11/2026pv 8 hin-t440nf(bk) sol | Thousand Oaks City | — |
| Feb 23, 2026 | Electrical | New roof mounted solar - 4.6kw - 10 modules - 1 inverter with ess - new 200a mpu | Riverside County | — |
| Feb 18, 2026 | Electrical | E-plan) 1 new ev charger. Applicant/installer shall verify maximum rating of the existing electrical panel is not exceeded. Note: approval subject to field veri | Thousand Oaks City | — |
| Feb 18, 2026 | Electrical | New roof mounted solar - 8.51kw - 21 modules - 2 inverters with ess - 1 gateway - new 200a load center - new 200a mpu | Thousand Oaks City | — |
| Feb 18, 2026 | Roofing | Comp out under solar arrays - remove 8 squares of tiles and underlayment - repair decking where needed - install 8 squares of comp shingle - install solar over | Thousand Oaks City | — |
| Feb 6, 2026 | Electrical | New roof mounted solar - 8.91kw - 22 modules - 1 inverter with ess - new 100a load panel | Thousand Oaks City | — |
Permit status
Where its permits stand, as the departments report them.
- Active11
- Completed9
- Finaled7
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.