Contractor · Specialty (solar, fire, telecom)

OC Solar

27 building permits since 2023 in Cypress city, CA; Thousand Oaks city, CA and Riverside County, CA, across 4 counties — $43,740 in reported job value over 2 permits that state one.

Building permits
27
Reported job value
$43.7K
Active
2023–2026
Latest permit
Mar 24, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Cypress city, CA10
  • Thousand Oaks city, CA8
  • Riverside County, CA4
  • Norwalk city, CA4
  • Agoura Hills city, CA1

Permits by year

By issue date (application date where there is none).

07.515
13
2023202420252026*
* 2026 is year to date.
View as table
YearPermits
20238
20242
20254
2026 (YTD)13

Type of work

Permits describing each kind of work; one permit can cover several.

  • Solar23
  • Roofing15
  • Electrical11
  • Battery storage6
  • EV chargers2

Permit types

As the building departments classify them.

  • Electrical11
  • Solar Residential Rooftop Permit8
  • Solar Permit4
  • Roofing2
  • Reroof Permit1
  • SolarAPP+ Solar Permit1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Mar 24, 2026ElectricalInstall (4.92kw dc) solar pv & (13.5kwh) ess system: (12) roof-mounted hanwa qcells (410w) solar modules w/ (12) enphase iq microinverters on (2) strings; (1) tAgoura Hills City—
Mar 11, 2026ElectricalNew roof mounted solar - 7.82kw - 17 mods - 1 inverter with ess - 1 dc expansion packRiverside County—
Feb 25, 2026ElectricalNew roof mounted solar add on system - 3.52kw - 1 inverter - new 125a subpanel. Rev b 2/25/26 approved per solar app + revision 3/11/2026pv 8 hin-t440nf(bk) solThousand Oaks City—
Feb 23, 2026ElectricalNew roof mounted solar - 4.6kw - 10 modules - 1 inverter with ess - new 200a mpuRiverside County—
Feb 18, 2026ElectricalE-plan) 1 new ev charger. Applicant/installer shall verify maximum rating of the existing electrical panel is not exceeded. Note: approval subject to field veriThousand Oaks City—
Feb 18, 2026ElectricalNew roof mounted solar - 8.51kw - 21 modules - 2 inverters with ess - 1 gateway - new 200a load center - new 200a mpuThousand Oaks City—
Feb 18, 2026RoofingComp out under solar arrays - remove 8 squares of tiles and underlayment - repair decking where needed - install 8 squares of comp shingle - install solar over Thousand Oaks City—
Feb 6, 2026ElectricalNew roof mounted solar - 8.91kw - 22 modules - 1 inverter with ess - new 100a load panelThousand Oaks City—

Permit status

Where its permits stand, as the departments report them.

  • Active11
  • Completed9
  • Finaled7

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.