Contractor · Demolition & excavation
MARK YOUNG
27 building permits since 2016 in Buffalo city, NY — $4,635,060 in reported job value over 27 permits that state one.
- Building permits
- 27
- Reported job value
- $4.6M
- Active
- 2016–2025
- Latest permit
- Dec 30, 2025
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Buffalo city, NY27
Permits by year
By issue date (application date where there is none).
048
7
2018202020232025
View as tableHide table
| Year | Permits |
|---|---|
| 2016 | 1 |
| 2018 | 3 |
| 2019 | 7 |
| 2020 | 1 |
| 2022 | 1 |
| 2023 | 3 |
| 2024 | 5 |
| 2025 | 6 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Demolition11
- Roofing4
- Remodels2
- Plumbing2
- Windows & doors2
- HVAC1
- Grading & excavation1
- Additions1
Permit types
As the building departments classify them.
- TEAROUT11
- REPAIR7
- DEMOLITION6
- GC2
- REP-PLANS1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Dec 30, 2025 | TEAROUT | <div>( 6TH FLOOR - SUITES 610, 615 & 618 PHASE 1 ) Interior tear out only in preparation for future work to be done on a separate permit. Project to i | Buffalo City | $11,580 |
| Dec 11, 2025 | TEAROUT | Removal and disposal of floor finishes, suspended acousticalceiling, plumbing fixtures, metal lockers, bollards, metal panels,storefront canopy, and signage- Re | Buffalo City | $200,000 |
| Oct 22, 2025 | TEAROUT | Interior demolition prior to renovations | Buffalo City | $62,190 |
| Jul 18, 2025 | REP-PLANS | Repairing +/-100 ft of existing dock on the side of the ship canal. DEC approved. C-1 Site plan and 1 sketch.<div><br></div><div>*** digeplan *** *** Army Corps | Buffalo City | $200,000 |
| Jun 10, 2025 | TEAROUT | Interior Demolition and abatement of ACM per attached survey and work plan. *** asbestos clean letter required prior to final inspection *** *** repair work to | Buffalo City | $535,000 |
| May 16, 2025 | GC | New addition: Metal building -4,445 SF, which is against the existing ADM manufacturing building. Metal building by Chief Metal building. No Mechanical or plumb | Buffalo City | $300,000 |
| Nov 27, 2024 | REPAIR | Existing Dock repair 22'x 400' in conjunction with PKLT24-961361 permit.DEC and Army Core of Engineers approved. *** DIGEPLAN *** | Buffalo City | $100,000 |
| Nov 19, 2024 | REPAIR | Removal of asbestos roofing and installation of temp roof. besides the penthouse which will be removed at a later date *** A CLEAN LETTER MUST BE PROVIDED PRIOR | Buffalo City | $91,000 |
Also on file as
The same name elsewhere
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.