Contractor · Electrical
JUST IN TIME ELECTRIC
27 building permits since 2025 in Sacramento County, CA; Costa Mesa city, CA and Elk Grove city, CA, across 4 counties — $39,000 in reported job value over 19 permits that state one.
- Building permits
- 27
- Reported job value
- $39K
- Active
- 2025–2026
- Latest permit
- Oct 15, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Sacramento County, CA10
- Costa Mesa city, CA5
- Elk Grove city, CA4
- Sacramento city, CA4
- Brea city, CA2
- Los Angeles city, CA1
- Riverside city, CA1
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2025 | 1 |
| 2026 (YTD) | 25 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Electrical26
- EV chargers17
- Gas1
- HVAC1
- Plumbing1
- Water heaters1
- Electric meters1
Permit types
As the building departments classify them.
- MISR9
- Insta-Permit: Residential Panel Upgrade (Licensed Contractor Only)5
- Single Family4
- Electrical3
- ONLINE VEHICLE CHARGING PERMIT3
- ELECTRICAL1
- PANR1
- Residential1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Oct 15, 2026 | MISR | Install one NEMA 14-50 EV charging outlet within 5 ft of the existing electrical panel, including a new 2-pole 40A breaker and #8 AWG wiring. | Sacramento County | $1,300 |
| Oct 14, 2026 | ONLINE VEHICLE CHARGING PERMIT | Install one NEMA 14-50 EV charging receptacle in the garage | Elk Grove City | $1,900 |
| Oct 13, 2026 | ONLINE VEHICLE CHARGING PERMIT | Install 40A circuit and customer-provided EV charger or NEMA | Elk Grove City | $1,400 |
| Oct 5, 2026 | MISR | Install customer-provided EV charger inside garage. Install new dedicated 240V circuit with one (1) 2-pole 40A Square D Homeline breaker, #8 AWG wiring, and 3/4 | Sacramento County | $1,900 |
| Oct 4, 2026 | PANR | Electrical service panel replacement or emergency repair only. No additional electrical, mechanical, plumbing, or structural work permitted.; Remove existing un | Sacramento County | $4,500 |
| Sep 22, 2026 | Single Family | EV Charter Permit: Install new dedicated 40A, 240V branch circuit from existing 200A service panel to new NEMA 14-50R receptacle for customer-provided ChargePoi | Sacramento | $1,300 |
| Sep 9, 2026 | Single Family | Install a new NEMA 14-50 receptacle for Level 2 EV charging at an existing single-family residence. | Sacramento | $1,300 |
| Sep 9, 2026 | Single Family | EV Charger Permit: Install a new Level 2 EV charging station at existing single-family residence, including a new dedicated 240V, 40A branch circuit with a 2-po | Sacramento | $1,200 |
Permit status
Where its permits stand, as the departments report them.
- Issued11
- Finaled6
- Active5
- Closed3
- Completed1
- Additional information required1
Also on file as
The same name elsewhere
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.