Contractor · Electrical
Jantz Electrical INC DBA COSMIC COMFORT
27 building permits since 2021 in Merced city, CA and Madera city, CA, across 2 counties — $310,503 in reported job value over 27 permits that state one.
- Building permits
- 27
- Reported job value
- $310.5K
- Active
- 2021–2026
- Latest permit
- Oct 14, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Merced city, CA26
- Madera city, CA1
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2021 | 1 |
| 2022 | 5 |
| 2024 | 2 |
| 2025 | 1 |
| 2026 (YTD) | 18 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Electrical15
- Windows & doors14
- HVAC13
- Roofing10
- Gas5
- Solar1
- Battery storage1
- Remodels1
- Additions1
- Plumbing1
Permit types
As the building departments classify them.
- Mechanical10
- Electrical8
- Legacy - Legacy Over the Counter7
- Additions & Alterations - SolarAPP1
- SRVC PANEL1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Oct 14, 2026 | Electrical | 2408 AND 2410 P STREET Replacing the two existing 100A main service panels with 100A square D panels. This will be a like for like replacement in the same locat | Merced City | $10,900 |
| Sep 29, 2026 | Electrical | Replace faulty 100 amp main electrical panel for single family home with over head service. ( PGE is disconnecting power since panel is arcing. Need permit for | Merced City | $5,000 |
| Sep 14, 2026 | Mechanical | Replacing existing HVAC gas split system with a 5T RUUD gas split system in the same location. ALL INSPECTIONS MUST BE SCHEDULED THROUGH YOUR CIVIC ACCESSS PORT | Merced City | $19,000 |
| Sep 8, 2026 | Electrical | Replace faulty zinsco panel with new 125 panel in same location with underground service. ALL REQUIRED INSPECTIONS MUST BE REQUESTED AND APPROVED PRIOR TO PROCE | Merced City | $4,500 |
| Sep 1, 2026 | Electrical | 100A MSP change out like for like same location ALL INSPECTIONS MUST BE SCHEDULED THROUGH YOUR CIVIC ACCESS PORTAL. ALL INDIVIDUALS RESPONSIBLE FOR SCHEDULING I | Merced City | $4,950 |
| Aug 26, 2026 | Electrical | Replace faulty 100a main panel with like for like 100a main with over head service for single family residential home. | Merced City | $4,200 |
| Aug 24, 2026 | Mechanical | Replacing existing HVAC gas split system with a 5T Ameristar gas split system in the same location. | Merced City | $18,121 |
| Aug 11, 2026 | Electrical | Replacing the two existing 100A main service panels with 100A square D panels. This will be a like for like replacement in the same location. ALL INSPECTIONS MU | Merced City | $4,650 |
Permit status
Where its permits stand, as the departments report them.
- Issued23
- Expired2
- Finaled1
- Approved1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.