Contractor · Specialty (solar, fire, telecom)

INTEGRITY SOLAR ELECTRIC CORP

27 building permits since 2016 in San Diego County, CA and Oceanside city, CA — $23,814 in reported job value over 3 permits that state one.

Building permits
27
Reported job value
$23.8K
Active
2016–2018
Latest permit
Jun 28, 2018

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • San Diego County, CA26
  • Oceanside city, CA1

Permits by year

By issue date (application date where there is none).

01020
16
201620172018
View as table
YearPermits
20166
201716
20185

Type of work

Permits describing each kind of work; one permit can cover several.

  • Solar27
  • Electrical2
  • Roofing1

Permit types

As the building departments classify them.

  • Existing19
  • New1
  • SFD SOLAR PV1
  • Unknown1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Jun 28, 2018—HRA (Online Permit) ROOF MOUNT RESIDENTIAL SOLAR PV FOR EXISTING SFD (No Meter Upgrade). This Permit does not exempt any existing structures from compliance witSan Diego County—
May 7, 2018—HRA (Online Permit) ROOF MOUNT RESIDENTIAL SOLAR PV FOR EXISTING SFD (No Meter Upgrade). This Permit does not exempt any existing structures from compliance witSan Diego County—
Apr 16, 2018—ROOF MOUNT RESIDENTIAL SOLAR PV FOR EXISTING SFD WITH EXISTING RESIDENTIAL MAIN ELECTRICAL SERVICE UPGRADE - 200A - (ONLINE PERMIT) *The scope of work is limiteSan Diego County—
Apr 11, 2018—ROOF MOUNT RESIDENTIAL SOLAR PV FOR EXISTING SFD Per Section 4620 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5' aSan Diego County—
Jan 23, 2018—ROOF MOUNT RESIDENTIAL SOLAR PV FOR EXISTING SFD WITH EXISTING RESIDENTIAL MAIN ELECTRICAL SERVICE UPGRADE - - (ONLINE PERMIT) *The scope of work is limited to San Diego County—
Dec 6, 2017ExistingHRA (Online Permit) ROOF MOUNT RESIDENTIAL SOLAR PV FOR EXISTING SFD (No Meter Upgrade). This Permit does not exempt any existing structures from compliance witSan Diego County—
Dec 6, 2017ExistingHRA (Online Permit) ROOF MOUNT RESIDENTIAL SOLAR PV FOR EXISTING SFD (No Meter Upgrade). This Permit does not exempt any existing structures from compliance witSan Diego County—
Nov 29, 2017ExistingHRA (Online Permit) ROOF MOUNT RESIDENTIAL SOLAR PV FOR EXISTING SFD (No Meter Upgrade). This Permit does not exempt any existing structures from compliance witSan Diego County—

Permit status

Where its permits stand, as the departments report them.

  • Completed18
  • Expired8
  • Finaled1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.