Contractor · Specialty (solar, fire, telecom)
INTEGRITY SOLAR ELECTRIC CORP
27 building permits since 2016 in San Diego County, CA and Oceanside city, CA — $23,814 in reported job value over 3 permits that state one.
- Building permits
- 27
- Reported job value
- $23.8K
- Active
- 2016–2018
- Latest permit
- Jun 28, 2018
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- San Diego County, CA26
- Oceanside city, CA1
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2016 | 6 |
| 2017 | 16 |
| 2018 | 5 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Solar27
- Electrical2
- Roofing1
Permit types
As the building departments classify them.
- Existing19
- New1
- SFD SOLAR PV1
- Unknown1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Jun 28, 2018 | — | HRA (Online Permit) ROOF MOUNT RESIDENTIAL SOLAR PV FOR EXISTING SFD (No Meter Upgrade). This Permit does not exempt any existing structures from compliance wit | San Diego County | — |
| May 7, 2018 | — | HRA (Online Permit) ROOF MOUNT RESIDENTIAL SOLAR PV FOR EXISTING SFD (No Meter Upgrade). This Permit does not exempt any existing structures from compliance wit | San Diego County | — |
| Apr 16, 2018 | — | ROOF MOUNT RESIDENTIAL SOLAR PV FOR EXISTING SFD WITH EXISTING RESIDENTIAL MAIN ELECTRICAL SERVICE UPGRADE - 200A - (ONLINE PERMIT) *The scope of work is limite | San Diego County | — |
| Apr 11, 2018 | — | ROOF MOUNT RESIDENTIAL SOLAR PV FOR EXISTING SFD Per Section 4620 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5' a | San Diego County | — |
| Jan 23, 2018 | — | ROOF MOUNT RESIDENTIAL SOLAR PV FOR EXISTING SFD WITH EXISTING RESIDENTIAL MAIN ELECTRICAL SERVICE UPGRADE - - (ONLINE PERMIT) *The scope of work is limited to | San Diego County | — |
| Dec 6, 2017 | Existing | HRA (Online Permit) ROOF MOUNT RESIDENTIAL SOLAR PV FOR EXISTING SFD (No Meter Upgrade). This Permit does not exempt any existing structures from compliance wit | San Diego County | — |
| Dec 6, 2017 | Existing | HRA (Online Permit) ROOF MOUNT RESIDENTIAL SOLAR PV FOR EXISTING SFD (No Meter Upgrade). This Permit does not exempt any existing structures from compliance wit | San Diego County | — |
| Nov 29, 2017 | Existing | HRA (Online Permit) ROOF MOUNT RESIDENTIAL SOLAR PV FOR EXISTING SFD (No Meter Upgrade). This Permit does not exempt any existing structures from compliance wit | San Diego County | — |
Permit status
Where its permits stand, as the departments report them.
- Completed18
- Expired8
- Finaled1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.