Contractor · Specialty (solar, fire, telecom)

EVERGREEN SOLAR & CONSTRUCTION INC

27 building permits since 2018 in Los Angeles city, CA; Sacramento city, CA and Davis city, CA, across 8 counties — $318,652 in reported job value over 15 permits that state one.

Building permits
27
Reported job value
$318.7K
Active
2018–2026
Latest permit
Feb 16, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Los Angeles city, CA9
  • Sacramento city, CA5
  • Davis city, CA4
  • Madera city, CA4
  • Stockton city, CA2
  • Kings County, CA1
  • Merced city, CA1
  • Temecula city, CA1

Permits by year

By issue date (application date where there is none).

07.515
14
2018202220242026*
* 2026 is year to date.
View as table
YearPermits
20182
20212
20224
202314
20241
20251
2026 (YTD)3

Type of work

Permits describing each kind of work; one permit can cover several.

  • Solar24
  • Electrical14
  • Plumbing4
  • Water heaters4
  • Roofing3
  • Battery storage2
  • Remodels1
  • New construction1

Permit types

As the building departments classify them.

  • Electrical10
  • Single Family5
  • PHOTOVALTIC RESIDENTIAL4
  • RESPVSOLAR3
  • 340-R1
  • Bldg-Alter/Repair1
  • BLDG - Building (R)1
  • RESPV P/C1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Feb 16, 2026ElectricalE-permit: residential - 10.12kw photovoltaic system main breaker replacement: - no, battery backup units: - 2, .Stockton City—
Feb 9, 2026340-RNEW RES PV ROOF MNT 4.14 KW 9 MODULES (EXISTING SYSTEM INSTALLED)Kings County—
Jan 14, 2026ElectricalE-permit: residential - 10.56kw photovoltaic system main breaker replacement: - no, battery backup units: - 0, .Stockton City—
May 20, 2025SolarROOF MOUNTED SOLAR PHOTOVOLTAIC MODULESSYSTEM SIZE: 9.20kW DC STC, 9.13kW AC CECMerced City$35,000
May 8, 2024PHOTOVALTIC RESIDENTIAL11.376 SOLAR ROOF ESSDavis City$80,000
Nov 28, 2023Single Family6kw Solar PV System, and 0gal Solar WH System (water heater installed null). All supply side connections, main breaker change-out, and/or panel upgrade will reqSacramento$7,000
Aug 17, 2023BLDG - Building (R)Online. Expedited. Roof mount solar 25 panels 10 kW with MPU B23-4816. Lucas residenceTemecula City—
Jul 6, 2023RESPV P/CP V SOLAR POWER SYSTEM / 5.92 KW DC (EXPRESS)Madera City$6,000

Permit status

Where its permits stand, as the departments report them.

  • Issued11
  • Not stated9
  • Completed5
  • Finaled2

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.