Contractor · General building
Colleen Sheahan
27 building permits since 2024 in Walpole town, MA; Medfield town, MA and North Attleborough Town city, MA, across 2 counties — $2,188,805 in reported job value over 27 permits that state one.
- Building permits
- 27
- Reported job value
- $2.2M
- Active
- 2024–2026
- Latest permit
- Oct 29, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Walpole town, MA16
- Medfield town, MA5
- North Attleborough Town city, MA2
- Canton town, MA2
- Needham town, MA2
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2024 | 1 |
| 2025 | 13 |
| 2026 (YTD) | 13 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Remodels23
- Electrical19
- Plumbing18
- Demolition18
- Kitchens15
- HVAC12
- Windows & doors11
- Bathrooms10
- Roofing2
Permit types
As the building departments classify them.
- Building Permit-All One and Two Family15
- Residential Building Permit5
- Building Permit4
- Building Permit - Residential (Single, 2-Family or Townhouses) Projects2
- Express Permit*ROOFING-SIDING-WINDOWS-DOORS ONLY*RESIDENTIAL ONLY** ALL OTHERS ARE BUILDING PERMITS1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Oct 29, 2026 | Building Permit-All One and Two Family | Bathroom Remodel: Second Floor - Demo to studs, Tub & fixtures will remain, update plumbing, update electrical, HVAC, tile installation, finish carpentry, plast | Walpole Town | $24,724 |
| Oct 22, 2026 | Building Permit | KITCHEN REMODEL W/STRUCTURAL CHANGES | Canton Town | $178,268 |
| Oct 20, 2026 | Building Permit-All One and Two Family | Bathroom Remodel: Demo to studs, update electrical, update plumbing, frame for new shower, tile installation, finish carpentry, plaster / paint. | Walpole Town | $30,695 |
| Oct 15, 2026 | Residential Building Permit | Kitchen Refresh: New countertops, install new kitchen sink, new faucet, garbage disposal, update electrical, install bar area. PERMIT REQUIRED TO BE ON SITE FOR | Medfield Town | $44,588 |
| Jun 25, 2026 | Residential Building Permit | Kitchen Remodel: Demo to studs, upgrade electrical, upgrade plumbing, HVAC = install hood and vent out, board / plaster, paint, new flooring, finish carpentry, | Medfield Town | $152,854 |
| Jun 22, 2026 | Building Permit-All One and Two Family | Kitchen Remodel: Demo to studs, framing, update electrical, update plumbing, insulation sheetrock / plaster, new cabinets, new flooring, refinish floors on firs | Walpole Town | $128,006 |
| Jun 3, 2026 | Building Permit | Unit A = Remodel Kitchen & Bathroom: Demo to studs, update electrical, update plumbing,new cabinets,keep existing appliances, new bathroom fixtures, new floorin | North Attleborough Town City | $34,000 |
| May 8, 2026 | Building Permit-All One and Two Family | Basement Remodel: Demo to studs, add bathroom, laundry room, family room, bedroom, electrical, plumbing, framing, HVAC, | Walpole Town | $149,743 |
Permit status
Where its permits stand, as the departments report them.
- Completed16
- Active11
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.