Contractor · General building
CMS WIRELESS, LLC (B000)
27 building permits since 2020 in Memphis city, TN; Shelby County, TN and Lakeland city, TN — $2,608,108 in reported job value over 27 permits that state one.
- Building permits
- 27
- Reported job value
- $2.6M
- Active
- 2020–2026
- Latest permit
- Aug 28, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Memphis city, TN16
- Shelby County, TN7
- Lakeland city, TN2
- Germantown city, TN1
- Millington city, TN1
Permits by year
By issue date (application date where there is none).
0510
10
2020202220242026*
View as tableHide table
| Year | Permits |
|---|---|
| 2020 | 1 |
| 2021 | 8 |
| 2022 | 2 |
| 2023 | 10 |
| 2024 | 1 |
| 2025 | 2 |
| 2026 (YTD) | 3 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Remodels19
- Telecom15
- Additions7
- Electrical3
- Gas1
- Generators1
- New construction1
Permit types
As the building departments classify them.
- COMMERCIAL ALTERATION PERMIT19
- COMMERCIAL ADDITION PERMIT7
- COMMERCIAL NEW CONSTRUCTION PERMIT1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Aug 28, 2026 | COMMERCIAL NEW CONSTRUCTION PERMIT | 200' Tower, 12x26' prefab shelter, 500 UG propane tank, 200A utility service. | Shelby County | $326,000 |
| Jun 16, 2026 | COMMERCIAL ALTERATION PERMIT | Verizon Wireless will be removing 6 antennas and adding 3 new antennas to existing stealth structure. No electrical work required. | Memphis city | $70,000 |
| Jan 23, 2026 | COMMERCIAL ALTERATION PERMIT | TOWER SCOPE OF WORK: -REMOVE (9) RRHs -INSTALL (3) ANTENNAS -INSTALL (9) RRUs -INSTALL (1) HYBRID CABLE -INSTALL (1) OVP BOX GROUND SCOPE OF WORK: -INSTALL (1) | Germantown city | $29,000 |
| Jul 1, 2025 | COMMERCIAL ALTERATION PERMIT | Verizon Wireless proposes to replace existing antennas with no changes to the height of the cell tower | Lakeland city | $152,850 |
| Feb 25, 2025 | COMMERCIAL ALTERATION PERMIT | TOWER WORK: REMOVE (3) ANTENNA(s), AND (9) RRH(s) INSTALL MOUNT MODIFICATIONS, (6) ANTENNA(s), (12) RRH(s), (1) OVP(s), AND (1) 1-1/4" (6X12) HYBRID EXISTING (6 | Memphis city | $15,000 |
| Feb 7, 2024 | COMMERCIAL ADDITION PERMIT | Verizon Wireless will be removing 6 antennas on existing tower and replacing them with 9 new antennas. No electrical work required. No change in footprint. | Shelby County | $87,000 |
| Nov 21, 2023 | COMMERCIAL ADDITION PERMIT | Adding fiber to the Verizon shelter. | Memphis city | $27,181 |
| Aug 18, 2023 | COMMERCIAL ALTERATION PERMIT | Verizon Equipment Modification on Existing Cell Tower | Shelby County | $130,425 |
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.