Contractor · General building
Christopher Burden
27 building permits since 2021 in Salem city, MA; Beverly city, MA and Marblehead town, MA, across 2 counties — $1,174,030 in reported job value over 27 permits that state one.
- Building permits
- 27
- Reported job value
- $1.2M
- Active
- 2021–2026
- Latest permit
- Sep 28, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Salem city, MA12
- Beverly city, MA3
- Marblehead town, MA3
- Danvers town, MA2
- Peabody city, MA2
- Swampscott town, MA2
- Manchester-by-the-Sea town, MA1
- Reading town, MA1
- Stoneham town, MA1
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2021 | 2 |
| 2022 | 3 |
| 2023 | 2 |
| 2024 | 4 |
| 2025 | 6 |
| 2026 (YTD) | 10 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Bathrooms10
- Remodels8
- Windows & doors4
- Plumbing2
- Electrical2
- Accessory dwelling units1
- Roofing1
- Additions1
Permit types
As the building departments classify them.
- Building Permit13
- Residential Building Permit4
- Building Permit - Residential3
- Building Permit - One and Two Family2
- Accessory Dwelling Unit Application1
- Building Permit Application: One or Two Family1
- Building Permit Application: Residential Roofing - Windows - Siding1
- Building Permit - Residential (ONE AND TWO FAMILY DWELLINGS ONLY)1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Sep 28, 2026 | Accessory Dwelling Unit Application | change existing detached garage into a 2 story adu | Salem City | $185,000 |
| Sep 3, 2026 | Building Permit | remove and replace existing deck staircase with the same thing as the current one is in poor condition due to rot | Salem City | $6,691 |
| Aug 5, 2026 | Building Permit - One and Two Family | Remove second floor window and frame in opening, patch in stucco, and finish drywall on interior in preparation for adding a bathroom in another upcoming projec | Swampscott Town | $5,000 |
| Jul 1, 2026 | Commercial Building Permit | Finish an unfinished basement and add bathroom to basement using drains preplanned for bathroom Unit #119 | Danvers Town | $63,300 |
| Jun 16, 2026 | Residential Building Permit | Finish basement including lvp fooring plaster ceiling, add bathroom using drains that were previously installed in preparation for a basement bathroom. Area to | Danvers Town | $63,300 |
| Jun 10, 2026 | Building Permit | Remove and rebuild existing deck 10x19 with platform and stairs - as per plans and discussed with GR (20" round ftg size required) | Reading Town | $32,140 |
| Jun 5, 2026 | Building Permit - Residential (ONE AND TWO FAMILY DWELLINGS ONLY) | Remove existing deck and frame a new deck in its place with composite material and also add a lower tier towards back yard. 14'x16' upper deck & 10'x14' lower d | Stoneham Town | $52,247 |
| Mar 30, 2026 | Building Permit | Remove existing cabinets install new cabinets add tile back aplash | Salem City | $28,820 |
Permit status
Where its permits stand, as the departments report them.
- Completed22
- Stop work ordered3
- Active2
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.