Contractor · HVAC
James Diede
339 building permits since 2015 in Bourne town, MA; Falmouth town, MA and Barnstable Town city, MA, across 3 counties — $2,827,640 in reported job value over 213 permits that state one.
- Building permits
- 339
- Reported job value
- $2.8M
- Active
- 2015–2026
- Latest permit
- Oct 20, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Bourne town, MA128
- Falmouth town, MA125
- Barnstable Town city, MA32
- Wareham town, MA26
- Quincy city, MA7
- Yarmouth town, MA5
- Plymouth town, MA5
- Brewster town, MA2
- Bridgewater Town city, MA2
- Duxbury town, MA2
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2015 | 1 |
| 2016 | 2 |
| 2018 | 2 |
| 2019 | 7 |
| 2020 | 29 |
| 2021 | 51 |
| 2022 | 57 |
| 2023 | 49 |
| 2024 | 51 |
| 2025 | 60 |
| 2026 (YTD) | 30 |
Type of work
Permits describing each kind of work; one permit can cover several.
- HVAC333
- Additions41
- Heat pumps31
- Bathrooms21
- Remodels10
- Gas5
- Plumbing5
- Electrical5
- Roofing3
- Kitchens2
Permit types
As the building departments classify them.
- SHT MTL128
- Mechanical/Sheet Metal Permit127
- Sheet Metal Permit67
- Building Permit Application5
- Mechanical Permit4
- Building Permit3
- *Sheet Metal/Heat Pump/Mini-Split Permit2
- Building- Express Permit RESIDENTIAL ONLY( Roof, siding, windows/doors, solar, insulation/weatherization, temp storage, fence ov1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Oct 20, 2026 | Sheet Metal Permit | installing 2 new hvac systems (one per side of home) in attic/knee walls using all new ductwork | Barnstable Town City | $30,000 |
| Oct 19, 2026 | Mechanical/Sheet Metal Permit | replace 2 hvac systems one in basement one in kneewall/attic | Bourne Town | $12,000 |
| Oct 8, 2026 | Mechanical/Sheet Metal Permit | swaping existing HVAC system in basement of older half of home | Bourne Town | $9,000 |
| Oct 6, 2026 | SHT MTL | install a new hvac system in the basement with all new ductwork for the 1st floor | Falmouth Town | — |
| Aug 28, 2026 | SHT MTL | install 2 new hvac systems with all new ductwork one in basement other in attic | Falmouth Town | — |
| Aug 20, 2026 | Mechanical/Sheet Metal Permit | relocate 2nd floor condenser. swap out 1st floor coil and condenser in new location. add ducting for addition | Bourne Town | $15,000 |
| Aug 20, 2026 | Mechanical/Sheet Metal Permit | install 2 new hydro air systems with a;ll new ductwork one unit will hand in basemnet above the height of the existing boiler and other in attic using all new d | Bourne Town | $20,000 |
| Aug 19, 2026 | SHT MTL | add ducting to the new 2nd floor addition off the existing 2nd floor unit and relocate 2 first floor ducts | Falmouth Town | — |
Permit status
Where its permits stand, as the departments report them.
- Active126
- Completed95
- Closed91
- Issued22
- Withdrawn2
- Stop work ordered2
- Cancelled1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.