Contractor · HVAC

Tony Guertin

28 building permits since 2020 in Newport city, RI; East Providence city, RI and North Kingstown town, RI, across 5 counties — $156,523 in reported job value over 23 permits that state one.

Building permits
28
Reported job value
$156.5K
Active
2020–2025
Latest permit
Aug 27, 2025

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Newport city, RI11
  • East Providence city, RI3
  • North Kingstown town, RI3
  • North Smithfield town, RI2
  • Providence city, RI2
  • Smithfield town, RI2
  • Warren town, RI1
  • Warwick city, RI1
  • Cumberland town, RI1
  • Narragansett town, RI1

Permits by year

By issue date (application date where there is none).

048
8
202020212022202320242025
View as table
YearPermits
20201
20214
20225
20238
20248
20252

Type of work

Permits describing each kind of work; one permit can cover several.

  • HVAC21
  • Fire sprinklers19
  • Electrical8
  • Plumbing7
  • Windows & doors3
  • Kitchens2
  • Bathrooms2
  • Water heaters2
  • Additions1
  • Demolition1

Permit types

As the building departments classify them.

  • Mechanical Permit21
  • Electrical Permit5
  • Fire Alarm Permit1
  • Sprinkler and Other Suppression Systems Permit1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Aug 27, 2025Mechanical PermitSCOPE OF WORK: * REMOVE COVERAGE (TWO HEADS AND BRANCH LINE) FROM OIL TANK ROOM ON EXTERIOR OF BUILDING (ROOM TO BE DEMOLISHED BY OTHERS). * INCLUDES DRAINING SWarren Town$1,300
Aug 25, 2025Mechanical PermitFEI proposes to replace (4) existing branch lines that are located in the shop at the peak of the building. FEI will also install (2) sprinkler heads that are rSmithfield Town$9,100
Nov 25, 2024Mechanical PermitSCOPE OF WORK: * PROVIDE FIRE SPRINKLER TECHNICAL LABOR AND MATERIALS TO PERFORM THE FOLLOWING - * EXTEND THE EXISTING SIDEWALL SPRINKLER HEAD IN THE UPPER COMPNewport City$3,400
Oct 1, 2024Electrical Permit—North Kingstown Town—
Sep 16, 2024Mechanical PermitSCOPE OF WORK: * PROVIDE FIRE SPRINKLER TECHNICAL LABOR AND MATERIALS TO COMPLETE THE FOLLOWING: - Reroute existing 3" fire sprinkler system main on second flooNewport City$4,000
Sep 3, 2024Fire Alarm PermitSCOPE OF WORK: * PROVIDE FIRE ALARM SYSTEM TECHNICAL LABOR AND SUPPLY MATERIALS TO INSTALL QTY. 2 LOW FREQUENCY HORN-STROBES (MAIN AREA AND BEDROOM) AND QTY. 1 Providence City$2,500
Aug 6, 2024Mechanical PermitSCOPE OF WORK: * PROVIDE FEI FIRE SPRINKLER SYSTEM TECHNICAL LABOR AND MATERIALS TO PERFORM AS FOLLOWS (PER 7/2/2024 SITE SURVEY WITH CUSTOMER AND CUSTOMER DIRESmithfield Town$8,000
Jun 6, 2024Mechanical PermitSCOPE OF WORK: * ADD FIRE SPRINKLER PROTECTION TO ONE 6'X9' COOLER AND ONE 5'X7' FREEZER LOCATED IN KITCHEN AREA * INCLUDES TIE-IN TO EXISTING WET FIRE SPRINKLENewport City$4,000

Permit status

Where its permits stand, as the departments report them.

  • Active22
  • Completed6

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.