Contractor · Electrical
Shoreline Marine Construction Inc. Brian Leaman
28 building permits since 2025 in Marathon city, FL — $1,389,466 in reported job value over 28 permits that state one.
- Building permits
- 28
- Reported job value
- $1.4M
- Active
- 2025–2026
- Latest permit
- Oct 29, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Marathon city, FL28
Permits by year
By issue date (application date where there is none).
01020
19
20252026*
View as tableHide table
| Year | Permits |
|---|---|
| 2025 | 9 |
| 2026 (YTD) | 19 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Electrical1
Permit types
As the building departments classify them.
- Building Permit28
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Oct 29, 2026 | Building Permit | Remove and replace an existing 150 sq ft portion of a T-shaped dock and to install an additional 85 sq ft extension. Two (2) new 10" piles will be installed to | Marathon City | $19,535 |
| Oct 27, 2026 | Building Permit | Install 20K boat lift | Marathon City | $31,000 |
| Oct 21, 2026 | Building Permit | Remove 451.99 sq. ft existing wood deock framing and decking and its replacement with 438.78 ft of new framing and decking in same footprint | Marathon City | $2,501 |
| Oct 16, 2026 | Building Permit | Removal of existing timber piles located in Slip 30. Install 206 sqft concrete dock between slip D30 and D31. Install 20K(4) pole boatlift slip D31. Install 10K | Marathon City | $76,610 |
| Sep 23, 2026 | Building Permit | INSTALL 111 SQFT WOOD DOCK W/ (6) 10" DIA. PT WOOD DOCK PILES PER PLAN. INSTALL 131 SQFT WOOD DOCK W/ (6) 10" DIA. PT WOOD DOCK PILES PER PLAN. INSTALL (4) POST | Marathon City | $35,000 |
| Sep 21, 2026 | Building Permit | Installation of a 8'x100' concrete cap on a 100' seawall with 85ft of associated backfill no more than 18" from existing seawall | Marathon City | $180,584 |
| Sep 16, 2026 | Building Permit | Install 16k side elevator lift per plan | Marathon City | $30,000 |
| Sep 3, 2026 | Building Permit | Remove existing boat lift to install 2 new piles and then reinstall the same boat lift in the same place. | Marathon City | $3,000 |
Permit status
Where its permits stand, as the departments report them.
- Completed15
- Active13
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.