Contractor · General building
Shaun Weston
28 building permits since 2020 in Sharon town, MA; Somerville city, MA and Braintree Town city, MA, across 3 counties — $1,160,322 in reported job value over 28 permits that state one.
- Building permits
- 28
- Reported job value
- $1.2M
- Active
- 2020–2026
- Latest permit
- Sep 29, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Sharon town, MA22
- Somerville city, MA1
- Braintree Town city, MA1
- Dedham town, MA1
- Needham town, MA1
- Walpole town, MA1
- Boston city, MA1
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2020 | 5 |
| 2021 | 6 |
| 2022 | 3 |
| 2023 | 2 |
| 2024 | 6 |
| 2025 | 4 |
| 2026 (YTD) | 2 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Remodels23
- Pools & hot tubs20
- Kitchens15
- Windows & doors11
- Bathrooms10
- Roofing4
- Demolition4
- HVAC2
- Additions2
- New construction1
Permit types
As the building departments classify them.
- Building Permit (includes remodels, pools, stoves, tents, signs, storage pod)20
- Express Building Permit (roofing, siding, windows, doors, weatherization)2
- Building Permit1
- Building Permit-All One and Two Family1
- Building Permit - Residential (Single, 2-Family or Townhouses) Projects1
- INTREN1
- RESI.1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Sep 29, 2026 | Express Building Permit (roofing, siding, windows, doors, weatherization) | Roof and siding replacement | Sharon Town | $6,500 |
| Mar 5, 2026 | Building Permit (includes remodels, pools, stoves, tents, signs, storage pod) | Remodel upstairs Bathroom. No structural changes. | Sharon Town | $26,328 |
| Dec 22, 2025 | Building Permit (includes remodels, pools, stoves, tents, signs, storage pod) | New front porch with roof overhang and steps to driveway | Sharon Town | $4,800 |
| Oct 6, 2025 | Building Permit-All One and Two Family | Home was purchased in a partial interior demolition state by prior owner. Non-load bearing walls were removed & flooring. GC stepping in: framing new kitchen wi | Walpole Town | $90,000 |
| May 15, 2025 | INTREN | INTREN | Boston City | $72,000 |
| Jan 29, 2025 | — | Update finishes: Carpet, Paint, refinish poor plaster repairs, partition walls @ 491B Broadway | Somerville City | $6,000 |
| Nov 26, 2024 | Building Permit | Demo: Back enclosed porch, deck and Front tree. Construction: Dormer rear roof for 2 story addition. Addition will not exceed the current front or left or right | Dedham Town | $250,000 |
| Jul 25, 2024 | RESI. | remodel kitchen: remove wall between kitchen & front livingroom. increase size of kitchen window, replace kitchen flooring, cabinets and countertops. | Braintree Town City | $50,663 |
Permit status
Where its permits stand, as the departments report them.
- Completed18
- Active6
- Closed2
- Withdrawn1
- Stop work ordered1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.