Contractor · Demolition & excavation

PRO-PAVE, INC.

28 building permits since 2012 in Arlington County, VA and District of Columbia, DC, across 2 counties.

Building permits
28
Reported job value
—
Active
2012–2025
Latest permit
Aug 13, 2025

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Arlington County, VA20
  • District of Columbia, DC8

Permits by year

By issue date (application date where there is none).

048
7
2012201920222025
View as table
YearPermits
20122
20173
20197
20207
20221
20234
20254

Type of work

Permits describing each kind of work; one permit can cover several.

  • Grading & excavation10
  • Demolition1

Permit types

As the building departments classify them.

  • Work in ROW10
  • Excavation ROW5
  • Transportation ROW - with excavation5

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Aug 13, 2025Excavation ROWEstimated 50 x24 ft area - Full depth asphalt replacement up to 8 inches on N Pollard St. Road needs to be shut down for safetyArlington County—
Aug 13, 2025Transportation ROW - with excavationEstimated 50 x24 ft area - Full depth asphalt replacement on N Pollard St. Road needs to be shut down for safetyArlington County—
Aug 11, 2025Excavation ROWFull depth asphalt workArlington County—
Aug 11, 2025Transportation ROW - with excavationFull depth asphalt work. +++ STREET SCAPE / SIDEWALK / RIGHT-OF-WAY ELEMENTS TO BE RESTORED PER ARLINGTON COUNTY CONSTRUCTION STANDARDS AND SPECIFICATIONS, AND Arlington County—
Mar 21, 2023Excavation ROWMill and Overlay of northbound and southbound lanes of N George Mason Drive from 19th St N to existing hospital entrance.Arlington County—
Mar 21, 2023Transportation ROW - with excavationMill and Overlay of northbound and southbound lanes of N George Mason Drive from 19th St N to existing hospital entrance.Arlington County—
Jan 18, 2023Excavation ROWAsphalt Mill and Overlay Curb to Curb of S Fern St from intersection of 18th St S to intersection of 15th St S. No excavation required beyond 2" of asphalt millArlington County—
Jan 9, 2023Transportation ROW - with excavationConstruct median and maintain traffic. The sidewalk is to remain open. The bike lane heading west is to be closed. This submission is to extend the end dateof tArlington County—

Permit status

Where its permits stand, as the departments report them.

  • Closed14
  • Expired8
  • Pending payment3
  • Additional information required2
  • Pending1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.