Contractor · Electrical
Mister Sparky
28 building permits since 2010 in Mesa city, AZ — $167,092 in reported job value over 27 permits that state one.
- Building permits
- 28
- Reported job value
- $167.1K
- Active
- 2010–2026
- Latest permit
- Oct 20, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Mesa city, AZ28
Permits by year
By issue date (application date where there is none).
036
6
2010202120242026*
View as tableHide table
| Year | Permits |
|---|---|
| 2010 | 3 |
| 2011 | 5 |
| 2021 | 4 |
| 2022 | 1 |
| 2024 | 3 |
| 2025 | 1 |
| 2026 (YTD) | 6 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Electrical28
- Electric meters8
- Gas1
- Generators1
Permit types
As the building departments classify them.
- Electrical18
- Res (OTH) -- Electrical8
- Single Family (Attached)2
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Oct 20, 2026 | Electrical | Replace exterior 200A service panel & add interior sub-panel. *** Permission from office to put this under different lot number. The correct Lot # is 456. There | Mesa | $9,000 |
| Oct 16, 2026 | Electrical | Install new 100A electric sub-panel inside garage. Minimum required building inspections: Electric rough in and electric final. | Mesa | $6,500 |
| Oct 16, 2026 | Electrical | Existing 200A electric service panel to be replaced with a 200A all-in-one electric service panel at the same location. Complete rewiring of the home is include | Mesa | $50,000 |
| Aug 3, 2026 | Electrical | Replace existing 200A 3 phase electrical panel like for like. New grounding rods and surge protector. Results in CofC. | Mesa | $5,500 |
| May 13, 2026 | Electrical | Installation of 200 Amp electric service - no plans required. Installation shall comply with City of Mesa codes and servicing electric utility requirements. DO | Mesa | $5,000 |
| Jan 12, 2026 | Electrical | “Residential Electrical Repair Like for Like-no plans required. Installation shall comply with City of Mesa codes and servicing electric utility requirements. D | Mesa | $2,000 |
| Jan 24, 2025 | Electrical | ELECTRICAL RUN TO GENERATOR. GENERATOR TO BE INSALLED PER MANUFACTURE SPECS. ALL WORK TO BE PERFORMED PER CITY OF MESA ADOPTED 2018 INTERNATIONAL CODE COUNCIL ( | Mesa | $5,000 |
| Nov 27, 2024 | Electrical | Installation of 200 Amp electric service - no plans required. Installation shall comply with City of Mesa codes and servicing electric utility requirements. DO | Mesa | $5,859 |
Permit status
Where its permits stand, as the departments report them.
- C/o issued13
- Finaled7
- Paid3
- Issued3
- Pending payment1
- Reviews in progress1
Also on file as
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.