Contractor · General building

joyal, ashbel w white

28 building permits since 2011 in Falmouth town, MA.

Building permits
28
Reported job value
—
Active
2011–2021
Latest permit
Aug 23, 2021

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Falmouth town, MA28

Permits by year

By issue date (application date where there is none).

036
6
201120132015201720192021
View as table
YearPermits
20111
20126
20132
20142
20151
20161
20174
20186
20193
20201
20211

Type of work

Permits describing each kind of work; one permit can cover several.

  • Roofing7
  • Windows & doors6
  • Remodels4
  • Bathrooms4
  • Additions3
  • Kitchens2
  • Accessory dwelling units1
  • Demolition1

Permit types

As the building departments classify them.

  • RESI.18
  • REP9
  • CEP1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Aug 23, 2021RESI.construct a 32x40 wood framed garage note: height certificate at frame inspectionFalmouth Town—
Nov 2, 2020RESI.replace existing free-standing wood framed deck and finish with pt decking and privacy fence, as per plan.Falmouth Town—
Aug 12, 2019CEPfalmouth academy replace 15 windows no header changeFalmouth Town—
Jun 24, 2019RESI.reconstruct 2nd floor of existing 2 car garage with a loft, increase height to 22', gambrel style to match house, bathroom hooked up to existing title 5. this iFalmouth Town—
Apr 4, 2019RESI.expand existing wood frame deck by 30.79sf and refinish surfaces with pvc decking, trim and railings as per plan.Falmouth Town—
Sep 21, 2018RESI.bathroom remodel, no structural changes, upgrading fixtures and finishes.Falmouth Town—
Sep 19, 2018RESI.replace existing bulkhead stairs (non-egress) and install new exterior door at bottom of stairs.Falmouth Town—
Aug 7, 2018REPreplacement of 11 windows with no header change and 4 squares of siding-white cedarFalmouth Town—

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.