Contractor · Electrical

Paul Aubin

345 building permits since 2017 in Providence city, RI; Warwick city, RI and East Providence city, RI, across 6 counties — $24,444,349 in reported job value over 330 permits that state one.

Building permits
345
Reported job value
$24.4M
Active
2017–2026
Latest permit
Aug 25, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Providence city, RI190
  • Warwick city, RI25
  • East Providence city, RI24
  • Pawtucket city, RI18
  • Smithfield town, RI11
  • Cumberland town, RI9
  • Lincoln town, RI9
  • Newport city, RI8
  • Cranston city, RI8
  • Johnston town, RI7

Permits by year

By issue date (application date where there is none).

03060
53
20182020202220242026*
* 2026 is year to date.
View as table
YearPermits
201724
201838
201953
202048
202118
202231
202337
202433
202542
2026 (YTD)21

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical345
  • Telecom22
  • Remodels18
  • Windows & doors14
  • Demolition4
  • HVAC3
  • New construction2
  • Kitchens1
  • Additions1

Permit types

As the building departments classify them.

  • Electrical Permit333
  • 2) Electrical Permit8
  • EG Electrical Permit3
  • Electrical Permit (Low Voltage)1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Aug 25, 2026Electrical PermitInstalling Cat-6A Green data cabling for classrooms and both lecture halls. Main telecom room is 166AProvidence City$115,000
Aug 20, 2026Electrical PermitInstalling only three new (3) data drops at first floor office area.Providence City$1,900
Aug 7, 2026Electrical PermitVery small job, installing 3 data drops for Brown wifi devices, all boxes and conduit by electrical subcontractor.Providence City$2,500
Jul 14, 2026Electrical PermitLow voltage Cat-6 data cabling in Basement only; only 12 wall drops.Providence City$12,000
Jul 14, 2026Electrical PermitCard Access and Video Surveillance SystemsProvidence City$50,000
Jun 12, 2026Electrical Permitinstall low voltage cabling on the first and lower levelProvidence City$34,000
Jun 9, 2026Electrical PermitInstalling low voltage Cat-6A and AV cabling in conduits and pathways all by others.Providence City$60,000
Jun 3, 2026Electrical PermitInstall low voltage cabling to support data, P.A and Access control systems. This permit is for phase 2 (Summer 2026 completion) and phase 3 (Summer 2027 compleMiddletown Town$135,000

Permit status

Where its permits stand, as the departments report them.

  • Completed204
  • Active123
  • Stop work ordered18

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.