Contractor · Electrical

FREDRICK HARRIS

28 building permits since 2022 in Warren County, NC and Roanoke Rapids city, NC, across 2 counties — $167,622 in reported job value over 28 permits that state one.

Building permits
28
Reported job value
$167.6K
Active
2022–2026
Latest permit
Oct 19, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Warren County, NC25
  • Roanoke Rapids city, NC3

Permits by year

By issue date (application date where there is none).

0510
10
20222023202420252026*
* 2026 is year to date.
View as table
YearPermits
20221
20233
20245
202510
2026 (YTD)9

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical28
  • Generators5
  • Electric meters4
  • Pools & hot tubs4
  • HVAC2
  • Demolition2
  • Gas1
  • Kitchens1
  • Heat pumps1

Permit types

As the building departments classify them.

  • Electrical Permit27
  • Residential Building Permit1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Oct 19, 2026Electrical PermitINSTALL 20KW GENERATOR WITH TWO TRANSFER SWITCHES; ONE DISCONNECT 200 AMP PANEL. UPGRADE GROUNDING SYSTEM BY ADDING GROUND RODS PER/CODE, AND CONNECT CABLING.Warren County$20,000
Sep 2, 2026Electrical PermitCHECK ELECTRICAL TO VERIFY SAFE TO RECONNECT POWER TO BUILDING.Warren County$100
Aug 27, 2026Electrical PermitINSTALL A 26KW GENERAC GENERATORWarren County$11,000
May 12, 2026Electrical PermitREPLACE MAST AND UPDATE GROUNDING SYSTEM. THE MAST LEANING AND DAMAGED!Warren County$1,200
May 8, 2026Electrical PermitINSTALL 200 AMP SERVICE AND TWO CEILING FANS, RECEPTACLE AT BACK ON PORCH.Warren County$4,000
Apr 29, 2026Electrical PermitINSTALL 200 SERVICE FOR FARM USE AT 183 EMBRO ODELL ROADWarren County$1,700
Apr 2, 2026Electrical PermitUPGRADE 150 AMP TO 200 AMP SYSTEM AND GROUNDING SYSTEM. REMOVING FEDERAL PACIFIC PANEL BOX IN UTILITY ROOM.Warren County$2,500
Apr 2, 2026Electrical PermitINSTALL AND TEST RUN THE GENERATOR. RUN 26KW GENERATOR CABLE 35 FEET TO GENERATOR AN CONNECT ELECTRICAL.Warren County$1,200

Permit status

Where its permits stand, as the departments report them.

  • Active17
  • Completed9
  • Stop work ordered2

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.