Contractor · Plumbing

HART PLUMBING & HEATING

348 building permits since 2018 in Hampton town, NH; Dover city, NH and Portsmouth city, NH, across 3 counties — $2,243,906 in reported job value over 312 permits that state one.

Building permits
348
Reported job value
$2.2M
Active
2018–2026
Latest permit
Oct 30, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Hampton town, NH170
  • Dover city, NH94
  • Portsmouth city, NH41
  • Exeter town, NH13
  • North Hampton town, NH12
  • Rochester city, NH11
  • Kittery town, ME6
  • Brentwood town, NH1

Permits by year

By issue date (application date where there is none).

02550
42
20182020202220242026*
* 2026 is year to date.
View as table
YearPermits
20182
20192
202011
202134
202227
20239
202442
202518
2026 (YTD)21

Type of work

Permits describing each kind of work; one permit can cover several.

  • HVAC244
  • Plumbing178
  • Remodels133
  • Gas119
  • Water heaters22
  • Bathrooms16
  • Heat pumps9
  • Kitchens8
  • Electrical6
  • Additions5

Permit types

As the building departments classify them.

  • Mechanical133
  • Plumbing48
  • Plumbing - Piping40
  • Mechanical - Gas36
  • Residential Plumbing/Mechanical/Gas Permit23
  • Commercial Plumbing/Mechanical/Gas Permit18
  • Mechanical - Climate Control (Oil, Gas, Exhaust, Ventilation)17
  • Mechanical Permit15

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Oct 30, 2026Mechanical - Climate Control (Oil, Gas, Exhaust, Ventilation)replace existing boiler with a Lochinvar Noble NKC150 95% efficient natural gas boilerDover City$13,500
Oct 22, 2026Plumbing - PipingRough plumbing for second floor laundryDover City$2,500
Oct 21, 2026Mechanical - Climate Control (Oil, Gas, Exhaust, Ventilation)Install Carlin EZ-Pro burner to convert heat from oil to natural gasDover City$2,000
Oct 7, 2026Mechanical - Gasinstall separate gas main to each unit leaving existing 2” main for far unit , each line includes 2psi regulator and connection to heat in unit .Dover City$16,000
Oct 6, 2026Plumbing - Pipingplumbing for (2) half baths, kitchen and water fountainDover City$5,000
Oct 1, 2026Mechanical - Climate Control (Oil, Gas, Exhaust, Ventilation)• Lochinvar NCF199 combi boilerDover City$13,200
Sep 24, 2026Mechanical - Climate Control (Oil, Gas, Exhaust, Ventilation)install LG mini split system to consist of 1-LG 18k head in 1st floor ,2-LG 7k heads in each 2nd floor bedroom all tied into a LG 30k Low temp outdoor condenserDover City$15,900
Sep 8, 2026PlumbingPlumbing to fixtures to include pex water and pvc drainage to full bath, kitchen and laundry. Tankless water heaterExeter Town$16,500

Permit status

Where its permits stand, as the departments report them.

  • Closed157
  • Completed71
  • Not stated41
  • Issued40
  • Expired12
  • Approved12
  • Active6
  • Void5

Also on file as

Spellings on its permits, combined into this profile because they work the same area:

  • HART PLUMBING AND HEATING INC
  • HART PLUMBING AND HEAT
  • HART PLUMBINGAND HEAT
  • HARTPLUMBINGANDHEAT
  • HARTPLUMBINGANDHEATING
  • HART PLUMBING AND HETING

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.