Contractor · Specialty (solar, fire, telecom)

ACR Solar International Corp

348 building permits since 2013 in Sacramento city, CA; Sacramento County, CA and Citrus Heights city, CA, across 3 counties — $6,748,061 in reported job value over 338 permits that state one.

Building permits
348
Reported job value
$6.7M
Active
2013–2026
Latest permit
Mar 30, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Sacramento city, CA102
  • Sacramento County, CA74
  • Citrus Heights city, CA65
  • Elk Grove city, CA59
  • Davis city, CA44
  • Placer County, CA4

Permits by year

By issue date (application date where there is none).

03060
54
20142017202020232026*
* 2026 is year to date.
View as table
YearPermits
20132
201417
201517
20167
20179
201818
201954
202029
202135
202224
202346
202434
202538
2026 (YTD)9

Type of work

Permits describing each kind of work; one permit can cover several.

  • Solar233
  • Electrical144
  • Plumbing110
  • Water heaters84
  • Pools & hot tubs49
  • Battery storage34
  • Roofing18
  • HVAC14
  • EV chargers10
  • Electric meters5

Permit types

As the building departments classify them.

  • Single Family99
  • MISR66
  • Electrical41
  • ELECTRICAL36
  • PHOTOVALTIC RESIDENTIAL35
  • PLUMBING22
  • Water Heater22
  • PLUMBING RESIDENTIAL7

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Mar 30, 2026ElectricalInstall ess on detached garage ****detached garage permitted bld24-01880**** ****existing solar permitted bld25-05402***** (n) ess: (4) tesla powerwall 3 (n) acPlacer County—
Mar 10, 2026ElectricalRemove and reinstall solar ****existing solar permitted bld17-00383Placer County—
Feb 18, 2026MISRInstalling - (14) MISSION 435W SOLAR MODULES (6) MCI-2 SOLAR SHUTDOWNS 1 TESLA POWERWALL 3 TESLA BACKUP SWITCH TESLA EV CHARGERSacramento County$29,785
Feb 3, 2026MISRReplacing SMUD meter socket after damager from panel upgrade done by another contractor.Sacramento County$500
Feb 2, 2026Single FamilyREMOVING EXISITING 7 SOLAR PANELS AND REINSTALLING WITH NEW MOUNTING MATERIAL IN THE SAME LOCATION LIKE FOR LIKE. PLANS FOR REFERENCE UPLOADED IN ATTACHMENTS. CSacramento$2,450
Jan 29, 2026Electrical—Placer County—
Jan 29, 2026MISRUninstall solar and reinstall in a better array for solar production and re roof.Sacramento County$4,200
Jan 21, 2026ElectricalInstall rm solar w/ ess on sfd ***(e) pv on bld21-02762*** (n) modules: (12) mission solar mst435hn6b 435w (n) rsd: (4) tesla mci-2 (n) inverter/ess: (2) tesla Placer County—

Permit status

Where its permits stand, as the departments report them.

  • Issued110
  • Finaled85
  • Completed77
  • Closed59
  • Expired4
  • Cancelled3
  • Reviews in progress3
  • Additional information required3

Also on file as

Spellings on its permits, combined into this profile because they work the same area:

  • A C R SOLAR INTERNATIONAL CORP
  • ACR SOLAR INTERNATIONAL CORP DBA ACR SOLAR

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.