Contractor · Plumbing
VALLEY OF FIRE GAS PIPING
29 building permits since 2016 in Mesa city, AZ — $14,695 in reported job value over 27 permits that state one.
- Building permits
- 29
- Reported job value
- $14.7K
- Active
- 2016–2022
- Latest permit
- Feb 10, 2022
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Mesa city, AZ29
Permits by year
By issue date (application date where there is none).
048
8
2016201820202022
View as tableHide table
| Year | Permits |
|---|---|
| 2016 | 5 |
| 2017 | 8 |
| 2018 | 6 |
| 2019 | 4 |
| 2020 | 1 |
| 2021 | 1 |
| 2022 | 1 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Gas29
- Plumbing29
- Pools & hot tubs4
Permit types
As the building departments classify them.
- Plumbing14
- Res (OTH) -- Plumbing9
- Single Family (Detached)5
- GAS LINE1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Feb 10, 2022 | Single Family (Detached) | Run 11/2 inch p.e. gas line with 18 gauge tracer wire from meter to fire pit and pool heater 70 feet total 450k btus total 18 inches of cover | Mesa | $700 |
| May 11, 2021 | Single Family (Detached) | INSTALL NEW GAS LINES: [G1] 150 FT OF 1" PE GAS PIPE FROM NMTER TO 80K BTU FIRE PIT. [G2] 5 FT T'd OFF OFMAIN LINE TO 65K BTU BBQ. ALL LINES TO HAVE A #18 TRACE | Mesa | $600 |
| Nov 12, 2020 | Plumbing | CONSTRUCT NEW GAS LINES: [G1] 65 SQ FT OF 1" PE GAS PIPE FROM METER TO 40K BBQ. [G2] 15 SQ FT OF 1" PE GAS PIPE T'D FROM THE BBQ TO 100K BTU FIRE PIT. A TOTAL O | Mesa | $350 |
| Sep 4, 2019 | Plumbing | P.E. GAS LINE TO 50,000 BTU FIRE PIT, TO BE RUN 15' OF 3/4", FROM EXISTING 3/4" GAS STUB TO BE 18" UNDERGROUND, WITH 18 GAUGE TRACER WIRE & APPROVED TRANSITION | Mesa | $300 |
| Sep 4, 2019 | Plumbing | P.E. GAS LINE TO 100,000 BTU FIRE PIT, TO BE RUN 120' OF 1" TO BE 18" UNDERGROUND, WITH 18 GAUGE TRACER WIRE & APPROVED TRANSITION RISER. GAS TO BE INSTALLED PE | Mesa | $400 |
| Jun 26, 2019 | Plumbing | INSTALL 130 LF OF NEW GAS LINE. 95 LF OF 1" PE PIPING FROM METER TO 80K BTU FIRE PIT. 30 LF OF 1" PE PIPING "T'd" OFF FROM FIRE PIT TO 50K BTU BBQ. #18, YELLOW, | Mesa | $495 |
| Mar 5, 2019 | Plumbing | EXPEDITED - Pickrell-run 3/4" p.e. gas line with 18 gauge tracer wire from meter to fire pit 100 feet total 90k BTU's total 18 inches of cover | Mesa | $400 |
| Dec 10, 2018 | Plumbing | EXISTING 400 SIZED METER. DOES NOT REQUIRE A METER UPGRADE. run 3/4 inch p.e. gas line from stub out to fire pit 18 inches of cover with tracer wire 18 gauge mi | Mesa | $400 |
Permit status
Where its permits stand, as the departments report them.
- Finaled11
- C/o issued9
- Issued6
- Paid1
- Pending payment1
- Reviews in progress1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.