Contractor · Electrical

M. W. Butler Electrical, LLC dba MW butler electrical

29 building permits since 2022 in Henrico County, VA — $45,700 in reported job value over 17 permits that state one.

Building permits
29
Reported job value
$45.7K
Active
2022–2026
Latest permit
Oct 28, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Henrico County, VA29

Permits by year

By issue date (application date where there is none).

012.525
22
20222026*
* 2026 is year to date.
View as table
YearPermits
202222
2026 (YTD)7

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical14
  • Generators8
  • Remodels7
  • Kitchens2
  • Electric meters2
  • HVAC1
  • Additions1
  • Bathrooms1
  • New construction1

Permit types

As the building departments classify them.

  • (All)14
  • Alteration7
  • New Installation7
  • Repair/Replacement1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Oct 28, 2026(All)***EMERGENCY*** REPLACE EXISTING METER BASE BURNT UP. METHOD OF WIRING SEUHenrico County—
Oct 2, 2026(All)rewiring 2nd floor bedrooms rewiring existing kitchen and pantry relocating 200amp service rewiring new addition back of home ****METHOD OF WIRING NMB AND SER**Henrico County—
Oct 2, 2026(All)100AMP FEED, 100AMP PANEL IN SHED, WIRE SWITCHES AND RECPT PER CUSTOMERS REQUEST. ***METHOD OF WIRING SER/NMB, USE 7 CIRCUITS, 3 LIGHTS, 2 SWITCHES, 12 RECEPTACHenrico County—
Jul 16, 2026(All)Installing 28kw generator w/2 200amp ats - method of wiring- using generator wire.Henrico County$2,450
Jul 7, 2026(All)INSTALLING AND WIRING 22KW GENERAC GENERATOR WITH (1)200 AMP ATS - ***METHOD OF WIRING USING GENERATOR WIRE****Henrico County$2,450
Feb 4, 2026(All)Duplicate permit - refund fees please. Wire new home and 400amp service.Henrico County—
Jan 13, 2026(All)wire sub panel in basement - Rewiring Kitchen, rewiring basement, rewire master bath. Adding recess lights throught the house, rewire screen porch method of wirHenrico County—
Sep 23, 2022(All)Wire and install a 22kw generator with a 200AMP transfer switch.Henrico County—

Permit status

Where its permits stand, as the departments report them.

  • Completed27
  • Issued1
  • Withdrawn1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.