Contractor · Electrical

FARADAY ELECTRIC CORP

352 building permits since 2019 in Los Angeles city, CA; San Diego County, CA and Oceanside city, CA, across 9 counties — $48,077 in reported job value over 39 permits that state one.

Building permits
352
Reported job value
$48.1K
Active
2019–2026
Latest permit
Sep 28, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Los Angeles city, CA145
  • San Diego County, CA60
  • Oceanside city, CA47
  • Mountain View city, CA18
  • Vista city, CA15
  • Riverside city, CA11
  • San Diego city, CA10
  • Temecula city, CA8
  • Anaheim city, CA6
  • Los Altos Hills town, CA6

Permits by year

By issue date (application date where there is none).

075150
148
2020202220242026*
* 2026 is year to date.
View as table
YearPermits
20193
20202
202116
2022148
2023105
202424
20257
2026 (YTD)45

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical344
  • EV chargers176
  • HVAC2

Permit types

As the building departments classify them.

  • Electrical178
  • BLD EVCS25
  • Building Misc - EV Charging Station13
  • Residential11
  • CH, EL10
  • BLD EVCS - SIMPLE9
  • BLD RESIDENTIAL PME - SIMPLE9
  • BLDG - Electrical (R)8

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Sep 28, 2026Residential(1) 60 AMP CIRCUIT FOR A LEVEL 2 ELECTRICAL VEHICLE CHARGERRiverside City$545
Sep 14, 2026ResidentialINSTALL (N) 60 AMP EV CHARGER IN GARAGERiverside City$785
Sep 8, 2026Residential(1) 60 AMP CIRCUIT FOR A LEVEL 2 ELECTRICAL VEHICLE CHARGERRiverside City$850
Sep 2, 2026ResidentialINSTALL (N) 40 AMP EV CHARGER IN GARAGERiverside City$657
Jul 15, 2026ELELECTRICAL VEHICLE CHARGER.VALUATION=545; IS THIS A NEW ELECTRICAL VEHICLE CHARGER INSTALL?=YES; IS IT A WALL PLUG OR DEDICATED CHARGER STATION?=DEDICATED CHARGMountain View City$545
Apr 9, 2026BLD EVCSLEVEL 2 EV CHARGER POWERED BY A 60AMP CIRCUIT BREAKER INSIDEOceanside City—
Mar 31, 2026Electrical—San Diego City—
Mar 30, 2026ElectricalElement: level 2 ev charger powered by a 60amp circuit breaker. Run no.6 thhn c.u. & no.10 thhn c.u. Ground through <40 feet new 3?4” emt conduit to power the lFremont City—

Permit status

Where its permits stand, as the departments report them.

  • Not stated172
  • Issued86
  • Finaled56
  • Documents submitted11
  • Active8
  • Completed8
  • Expired7
  • Withdrawn2

Also on file as

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.