Contractor · General building
Joshua LaCroix
29 building permits since 2018 in Cumberland town, RI; Smithfield town, RI and Warwick city, RI, across 5 counties — $505,769 in reported job value over 29 permits that state one.
- Building permits
- 29
- Reported job value
- $505.8K
- Active
- 2018–2026
- Latest permit
- Aug 6, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Cumberland town, RI4
- Smithfield town, RI4
- Warwick city, RI3
- North Smithfield town, RI3
- Providence city, RI3
- Westerly town, RI3
- Bristol town, RI2
- Burrillville town, RI2
- Ashford town, CT1
- Coventry town, RI1
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2018 | 2 |
| 2019 | 2 |
| 2023 | 2 |
| 2024 | 8 |
| 2025 | 8 |
| 2026 (YTD) | 7 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Bathrooms11
- Kitchens5
- Electrical4
- Remodels3
- Additions3
- Plumbing3
- HVAC2
- Roofing2
- Demolition2
- Windows & doors2
Permit types
As the building departments classify them.
- Building Permit25
- Electrical Permit3
- Building1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Aug 6, 2026 | Building Permit | Restoration of kitchen and basement storage room after burst water pipe caused damages. Installation of kitchen cabinets, flooring and reframing storage room wa | Woonsocket City | $45,399 |
| Aug 3, 2026 | Building Permit | Increasing basement closet size from 29" Deep x 91" Wide to 9' Deep X 91" Wide. in a bedroom | Warwick City | $3,500 |
| Jun 3, 2026 | Building Permit | Frame to finish of existing basement with a full bathroom that was pre-plumbed during construction of the house. | Cumberland Town | $85,000 |
| Apr 3, 2026 | Building Permit | Removal of existing kitchen closet and drywall around kitchen to prep for new cabinet installation. | Providence City | $12,000 |
| Feb 26, 2026 | Building Permit | Installation of full bathroom in basement space that was previously used as a mechanical room. | Cumberland Town | $24,000 |
| Feb 5, 2026 | Building Permit | Reconfiguration of existing bathroom, pending confirmation of structural possibility after demo is completed. Converting an upstairs full bathroom into a toilet | Providence City | $30,000 |
| Jan 8, 2026 | Building Permit | Removal of existing shower and bathtub, installation of new tile shower with framed out niche. | Warwick City | $12,000 |
| Dec 9, 2025 | Building Permit | Continuing kitchen remodel after previous contractor started the work. | Providence City | $8,000 |
Permit status
Where its permits stand, as the departments report them.
- Active17
- Completed11
- Approved1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.