Contractor · Specialty (solar, fire, telecom)

GREEN CONSTRUCTION MULTISERVICES LLC

29 building permits since 2023 in Howard County, MD — $2,236,017 in reported job value over 9 permits that state one.

Building permits
29
Reported job value
$2.2M
Active
2023–2026
Latest permit
Oct 30, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Howard County, MD29

Permits by year

By issue date (application date where there is none).

07.515
14
2023202420252026*
* 2026 is year to date.
View as table
YearPermits
20233
20248
20254
2026 (YTD)14

Type of work

Permits describing each kind of work; one permit can cover several.

  • Solar26
  • Electrical20
  • Remodels6
  • Electric meters2
  • HVAC1
  • Roofing1
  • Additions1

Permit types

As the building departments classify them.

  • Commercial Electrical Permit19
  • Commercial Alteration Permit6
  • Commercial Miscellaneous Permit2
  • Residential Electrical Miscellaneous Permit1
  • Solar Express (Residential Only)1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Oct 30, 2026Commercial Electrical PermitInstallation of a PV roof mount solar system size 557.515 kW DC with 937 Vsun panels and 4 Solar Edge inverters.Howard County—
Oct 20, 2026Commercial Electrical PermitGlenwood library/ Installation of a pv solar roof mount system size of 179kw dc with 328 Vsun panels, 1 se40kus inverter, and 1 se100kus inverter. b26001920Howard County—
Oct 7, 2026Commercial Electrical PermitVERY BEST WHOLESALE DISTRIBUTOR/ Installation of a roof top Solar system size of (1,114) 18 KW DC with 1921 Jinko Solar and 7 Solar Edge invertersHoward County—
Sep 22, 2026Commercial Miscellaneous PermitSTE A/Prologis Installation of 725.305 KWDC rooftop solar system consisting of 1219 VSUN 595W modules and 5 Solaredge SE-TRI-USSEIBN120KUS invertersHoward County$253,857
Sep 9, 2026Commercial Electrical PermitInstallation of a Roof top mounted Solar System size of 152.1 KW DC with 279 VSun Solar panels and 3 SolarEdge invertersHoward County—
Sep 1, 2026Commercial Electrical PermitTRAIL RIDGE POWER/ Installation of a roof top pv solar mount system size of 559.32 kw dc with 948 q cells Solar panels and 4 Solar Edge inverters; (1) 800a servHoward County—
Aug 27, 2026Commercial Alteration PermitWHOLE BUILDING/Prologis installation of a 1114.18 KWDC rooftop solar system consisting of (1921) Jinko Eagle 580 w modules and 5 SE-TRI-USSEIBN100KUS and 2 SE-THoward County$389,963
Aug 27, 2026Commercial Alteration PermitPATAPSCO VALLEY BUSINESS CENTER/Prologis installation of a 598.20 KWDC rooftop solar system consisting of 997 JA Solar 600W modules and 4 SolarEdge SE-TRI-USSEIHoward County$209,370

Permit status

Where its permits stand, as the departments report them.

  • Completed15
  • Issued9
  • Cancelled4
  • Reviews in progress1

Also on file as

Spellings on its permits, combined into this profile because they work the same area:

  • GREEN CONSTRUCTION MULTI SERVICES
  • GREEN CONSTRUCTION MULTI SERVICES LLC

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.