Contractor · HVAC

Air Rite Mechanical Systems Inc

354 building permits since 2011 in Minneapolis city, MN; Blaine city, MN and Columbia Heights city, MN, across 2 counties — $738,762 in reported job value over 43 permits that state one.

Building permits
354
Reported job value
$738.8K
Active
2011–2026
Latest permit
Oct 28, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Minneapolis city, MN340
  • Blaine city, MN12
  • Columbia Heights city, MN1
  • Lino Lakes city, MN1

Permits by year

By issue date (application date where there is none).

03060
60
20122017202020232026*
* 2026 is year to date.
View as table
YearPermits
20111
20121
20151
20161
20171
201830
201941
202048
202160
202243
202340
202452
202513
2026 (YTD)22

Type of work

Permits describing each kind of work; one permit can cover several.

  • HVAC309
  • Bathrooms71
  • Gas63
  • Plumbing63
  • New construction37
  • Remodels18
  • Kitchens14
  • Heat pumps9
  • Water heaters6
  • Additions3

Permit types

As the building departments classify them.

  • Mechanical296
  • Plumbing45
  • BLDG - Residential12
  • Mechanical Residential Alteration, Remodel, Repair1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Oct 28, 2026MechanicalREplace furnace and acMinneapolis City—
Oct 15, 2026MechanicalInstalling a furnace and ac and ducting for second level addition and making alterations to existing duct system for main level addition.Minneapolis City—
Sep 17, 2026MechanicalReplace gravity boiler with new 84% boilerMinneapolis City—
Sep 9, 2026MechanicalReplace rooftop equipment Review Note: Unless technically unfeasible, new and replacement rooftop equipment shall be provided with insulated curbs as described Minneapolis City$38,565
Sep 8, 2026MechanicalReplace existing black iron gas line from meter with new flash shield 1/2 gas tight.Minneapolis City—
Sep 1, 2026Mechanicalsupply to 2nd level bathroom.Minneapolis City—
Aug 25, 2026MechanicalReplace A/CMinneapolis City—
Aug 11, 2026MechanicalReplace acMinneapolis City—

Permit status

Where its permits stand, as the departments report them.

  • Closed308
  • Issued23
  • Expired12
  • Finaled8
  • Cancelled2
  • Completed1

Also on file as

Spellings on its permits, combined into this profile because they work the same area:

  • AIR RITE MECHANICALSYSTEMS INC
  • AIR RITE MECHANICAL SYSTEMS

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.