Contractor · Plumbing

Doug Neveu

29 building permits since 2020 in Grafton town, MA; South Windsor town, CT and Norwich town, CT, across 11 counties — $793,719 in reported job value over 15 permits that state one.

Building permits
29
Reported job value
$793.7K
Active
2020–2026
Latest permit
Aug 13, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Grafton town, MA11
  • South Windsor town, CT4
  • Norwich town, CT2
  • 2501519370, MA2
  • Marlborough city, MA2
  • North Canaan town, CT1
  • Branford town, CT1
  • Stamford town, CT1
  • Taunton city, MA1
  • Andover town, MA1

Permits by year

By issue date (application date where there is none).

048
7
2020202220242026*
* 2026 is year to date.
View as table
YearPermits
20201
20214
20224
20235
20244
20254
2026 (YTD)7

Type of work

Permits describing each kind of work; one permit can cover several.

  • Gas19
  • Plumbing18
  • HVAC8
  • Roofing2
  • Bathrooms2
  • Generators1

Permit types

As the building departments classify them.

  • Gas Fitter Permit9
  • Plumbing Permit7
  • Mechanical Permit5
  • GAS3
  • Gas Permit - Commercial2
  • Plumbing and/or Gas Permit2
  • Gas Permit Application1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Aug 13, 2026Mechanical PermitReplace 800 feet of gas piping, no new fixtures.Branford Town$250,000
Aug 11, 2026Gas Fitter PermitReplace a portion of existing high pressure gas piping with new high pressure gas piping per stamped design.Grafton Town—
Aug 11, 2026Plumbing PermitReplace old worn out potable water piping with new potable water piping. No new fixtures.Grafton Town—
Aug 10, 2026Gas Permit - Commercial—Marlborough City$19,500
Jun 24, 2026Plumbing PermitRelocate 3 gas shutoff valves on existing boilers. New valves will be used, no new equipment or BTU's.Stamford Town$7,000
May 13, 2026Gas Fitter PermitRemove and cap obsolete gas piping and valves. Approximately 80 feet.Grafton Town—
Mar 25, 2026Plumbing PermitReplace old worn out potable water lines, piping only, no new fixtures.Grafton Town—
Oct 13, 2025Plumbing PermitInstall two additional roof drains at customers direction and tie into existing drainage system. There is no new roof square footage, the added new drains will South Windsor Town$8,889

Permit status

Where its permits stand, as the departments report them.

  • Active17
  • Completed8
  • Stop work ordered3
  • Issued1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.