Contractor · Roofing
COMMERCIAL INDUSTRIAL ROOFING
29 building permits since 2002 in Seattle city, WA; Everett city, WA and Tacoma city, WA, across 3 counties — $4,990,343 in reported job value over 28 permits that state one.
- Building permits
- 29
- Reported job value
- $5M
- Active
- 2002–2026
- Latest permit
- Aug 19, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Seattle city, WA13
- Everett city, WA12
- Tacoma city, WA3
- Auburn city, WA1
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2002 | 1 |
| 2003 | 1 |
| 2007 | 1 |
| 2014 | 2 |
| 2016 | 2 |
| 2017 | 1 |
| 2019 | 1 |
| 2020 | 4 |
| 2021 | 8 |
| 2022 | 4 |
| 2023 | 2 |
| 2024 | 1 |
| 2026 (YTD) | 1 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Roofing24
Permit types
As the building departments classify them.
- Commercial12
- BUILDING11
- ePermit2
- Building1
- COMMERCIAL BUILDING1
- Multifamily1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Aug 19, 2026 | Commercial | Overlay existing roofing system apply new PVC fleeceback membrane mechanically attached. Install new perimeter coping metal | Seattle City | $323,093 |
| Oct 3, 2024 | COMMERCIAL BUILDING | THIS IS AN OVERLAY INSTALLATION OVER THE METAL ROOF | Everett City | $130,000 |
| Feb 21, 2023 | ePermit | remove existing metal panels from roof and replace with similar, new panels. | Tacoma City | $200,000 |
| Feb 16, 2023 | Building | CANNCELLED - SCOPE OF WORK UNDER ESTRIP23-0002 remove existing metal roof panels and install new around perimeter of building (approx 15% of total roof area) | Tacoma City | $200,000 |
| Dec 6, 2022 | Commercial | Overlay- Install one layer of 1/2" HD cover board mechanically attached to the existing roof and install one layer of 60mil TPO single-ply membrane over the pre | Seattle City | $17,200 |
| Sep 28, 2022 | Commercial | OVERLAY THE ENTIRE ROOF SURFACE WITH A MECHANICALLY ATTACHED VERSICO 45MIL WHITE TPO MEMBRANE | Seattle City | $91,200 |
| Sep 28, 2022 | ePermit | OVERLAY INSTALLATION OF 60MIL TPO MEMBRANE WITH RHINOBOND ATTACHMENT | Tacoma City | $130,048 |
| Mar 21, 2022 | Commercial | Removal of the existing roof system down to the substrate followed by examination of the deck and replacement if rotten or damaged. Fastening of the min 3 layer | Seattle City | $985,346 |
Permit status
Where its permits stand, as the departments report them.
- Not stated12
- Completed10
- Finaled3
- Expired2
- Issued1
- Cancelled1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.