Contractor · Electrical
Brian Crump
29 building permits since 2020 in Stratford town, CT; New Canaan town, CT and Stonington town, CT, across 5 counties — $455,023 in reported job value over 26 permits that state one.
- Building permits
- 29
- Reported job value
- $455K
- Active
- 2020–2026
- Latest permit
- Oct 28, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Stratford town, CT4
- New Canaan town, CT4
- Stonington town, CT3
- New Fairfield town, CT3
- Stamford town, CT3
- Wilton town, CT3
- Winchester town, CT2
- New Milford town, CT2
- Ridgefield town, CT2
- Greenwich town, CT1
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2020 | 1 |
| 2024 | 4 |
| 2025 | 3 |
| 2026 (YTD) | 21 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Generators26
- Electrical19
- HVAC5
- Gas4
- Battery storage2
- Plumbing2
- Electric meters2
- Solar1
- EV chargers1
- Windows & doors1
Permit types
As the building departments classify them.
- Electrical Permit15
- Electrical Permit Application2
- Sitework and Site Mechanical Location Application New-A/C, Propane, Generators, Sheds/gazebos under 200 sq.ft, driveways, lot cl2
- Building Permit1
- Building Permit (No Trades)1
- GEN1
- Generator Permit1
- Generator Permit Application1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Oct 28, 2026 | Mechanical Permit | Install gas lines from meter in boiler room to outside to generator location | Stamford Town | $17,611 |
| Oct 27, 2026 | Building Permit | Install 14kw generator in back left corner of the house. Install 200A transfer switch. Subcontractor will install gas piping from boiler room to generator. | Stamford Town | $17,611 |
| Oct 27, 2026 | Electrical Permit | Install 14kw generator in back left corner of the house. Install 200A transfer switch. | Stamford Town | $17,611 |
| Oct 27, 2026 | Sitework and Site Mechanical Location Application New-A/C, Propane, Generators, Sheds/gazebos under 200 sq.ft, driveways, lot cl | — | Wilton Town | — |
| Oct 22, 2026 | RESIDENTIAL MECHANICAL | Remove existing generator equipment, replace with 20kw Kohler generator with 200A ATS in same exaction locations in back of home and basement & upgrade necessar | Lewisboro Town | $13,835 |
| Sep 10, 2026 | Electrical Permit | Installation of a Tesla Powerwall 3 and Tesla expansion pack in garage of townhouse and associated wiring back to transfer equipment in basement next to main el | New Canaan Town | $29,000 |
| Sep 4, 2026 | Electrical Permit Application | Installation of a 22KW Generac generator and 200A ATS | New Fairfield Town | $8,000 |
| Aug 17, 2026 | Generator Permit | The installation of a generator and an automatic transfer switch. | Wilton Town | $20,000 |
Permit status
Where its permits stand, as the departments report them.
- Active17
- Completed11
- Stop work ordered1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.