Contractor · General building

Atlantic Constructors dba Atlantic Constructors

29 building permits since 2022 in Henrico County, VA — $35,116,597 in reported job value over 22 permits that state one.

Building permits
29
Reported job value
$35.1M
Active
2022–2026
Latest permit
Oct 5, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Henrico County, VA29

Permits by year

By issue date (application date where there is none).

07.515
11
2022202320242026*
* 2026 is year to date.
View as table
YearPermits
202211
20236
20241
2026 (YTD)11

Type of work

Permits describing each kind of work; one permit can cover several.

  • HVAC5
  • Remodels4
  • Fire sprinklers4
  • Additions3
  • Demolition3
  • Plumbing2
  • Water heaters2
  • Gas1
  • Roofing1
  • Generators1

Permit types

As the building departments classify them.

  • (All)13
  • Repair/Replacement9
  • Alteration4
  • New Installation2
  • Addition1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Oct 5, 2026(All)To adjust with another code modification for the sprinkler heads to come down to 15" below the glass roof glazing. An additional 2" from what was previously insHenrico County—
Jul 22, 2026(All)Relocate and Add sprinkler heads for new tenant layout Using pipe only no whipsHenrico County$8,000
Jul 22, 2026(All)Provide and install a 250 -ton, air-cooled, trailer-mounted temporary chiller, including flexible piping. Demolition of two existing chillers from the site, perHenrico County$1,885,106
Jul 22, 2026(All)Demolition and Installation of two cooling towers and Associated piping. Demolition Installation of condenser water pumps in the mechanical room. Installation oHenrico County—
Jul 21, 2026(All)Add 3 new ceiling mounted strobesHenrico County$5,000
Jul 1, 2026(All)Demo wall horn/strobes strobes and add new LED ceiling mounted for new tenant layout .Remove pull stations that are no longer needed .Henrico County$22,000
Jul 1, 2026(All)Addition of the mechanical work for 9-story tower with two shell floors on the 6th and 7th floors as well as some work in existing connected buildings to faciliHenrico County$17,626,267
Jul 1, 2026(All)Addition of the plumbing for a 9-story tower with two shell floors on the 6th and 7th floors. This work will include underground sanitary plumbing piping, underHenrico County$12,959,860

Permit status

Where its permits stand, as the departments report them.

  • Completed22
  • Issued5
  • Cancelled1
  • Reviews complete1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.