Contractor · Roofing

Roofs by George Inc.

30 building permits since 2007 in St. Joseph city, MI — $184,101 in reported job value over 30 permits that state one.

Building permits
30
Reported job value
$184.1K
Active
2007–2025
Latest permit
Jul 7, 2025

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • St. Joseph city, MI30

Permits by year

By issue date (application date where there is none).

02.55
5
20092014201820212025
View as table
YearPermits
20071
20081
20091
20111
20135
20142
20151
20171
20182
20191
20204
20211
20235
20243
20251

Type of work

Permits describing each kind of work; one permit can cover several.

  • Roofing30

Permit types

As the building departments classify them.

  • Building30

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Jul 7, 2025BuildingREMOVE SHINGLES, INSTALL HI TEMP WATER & ICE, INSTALL STANDING SEAM METALSt. Joseph City$14,500
Aug 28, 2024BuildingREMOVE EXISTING FLAT ROOF MATERIAL; INSTALL 2.6" ISO BOARD INSULATION. INSTALL 60 60 MILL EPOM RUBBER. NEW METAL PERIMETER CAP.St. Joseph City$9,500
Jul 2, 2024BuildingREMOVE ALL EXISTING ROOF MATERIALS. INSTALL 2 ROWS WATER AND ICE; DRIP EDGE 1.5" SYNTHETIC DECK COVERING, PIPE BOOTS, FLASH CHIMNEY WITH METAL. INSTALL CERTAINTSt. Joseph City$7,800
May 20, 2024BuildingREMOVE ALL ROOFING MATERIALS. INSTALL 2 ROW WATER & ICE, DRIP EDGE, PIPE BOOTS, RIDGE VENT, SYNTHETIC DECK COVERING. INSTALL CERTAINTEED LANDMARK SHINGLES.St. Joseph City$7,500
Oct 24, 2023BuildingREMOVE EXISTING ROOF MATERIALS, INSTALL WATER & ICE, DRIP EDGE, PIPE BOOTS, FLASHING, CERTAINTEED LANDMARK SHINGLES.St. Joseph City$4,500
Jun 13, 2023BuildingREMOVE ALL EXISTING ROOF MATERIAL. INSTALL SYNTHETIC DECK COVERING THROUGHOUT. INSTALL NEW 1.5" DRIP EDGE & STARTER. INSTALL NEW CERTANTEED ARCHITICTURAL SHINGLSt. Joseph City$4,500
May 31, 2023BuildingREMOVE ALL EXISTING ROOF MATERIALS, INSTALL WATER & ICE SHIELD ON ALL EVES & VALLEYS. FLASH CHIMNEY WITH METAL. INSTALL SYNTHETIC DECK COVERING. INSTALL CERTAINSt. Joseph City$8,500
Apr 28, 2023BuildingREMOVE ALL EXISTING ROOF MATERIALS. INSTALL NEW 60 MILL EPDM RUBBER ROOF SYSTEM. INSTALL NEW ISO INSULATOIN BOARD. INSTALL NEW METAL KNEE WALL CAPSt. Joseph City$18,000

Permit status

Where its permits stand, as the departments report them.

  • Expired11
  • Closed10
  • Finaled9

Also on file as

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.