Contractor · Electrical
RME INNOVATIONS INC
30 building permits since 2023 in Sacramento County, CA; Sacramento city, CA and Elk Grove city, CA, across 7 counties — $449,000 in reported job value over 26 permits that state one.
- Building permits
- 30
- Reported job value
- $449K
- Active
- 2023–2026
- Latest permit
- Sep 3, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Sacramento County, CA13
- Sacramento city, CA7
- Elk Grove city, CA3
- Marin County, CA2
- Amador County, CA1
- Glenn County, CA1
- Placer County, CA1
- San Pablo city, CA1
- Stockton city, CA1
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2023 | 3 |
| 2024 | 5 |
| 2025 | 12 |
| 2026 (YTD) | 10 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Solar21
- Electrical13
- Plumbing9
- Battery storage7
- Water heaters7
- Electric meters3
- Accessory dwelling units2
- HVAC2
- Gas1
Permit types
As the building departments classify them.
- Single Family5
- SolarApp5
- SLCR4
- Electrical3
- ONLINE SOLAR PHOTOVOLTAIC PERMITS3
- MISR2
- PANR2
- RESIDENTIAL2
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Sep 3, 2026 | Single Family | Reviewed by SolarApp+ 10.4kw Solar PV System, 0 kw PV Storage System Size and nullgal Solar WH System (water heater installed null). | Sacramento | $28,000 |
| Aug 24, 2026 | Single Family | Reviewed by SolarApp+ 11kw Solar PV System, 0 kw PV Storage System Size and nullgal Solar WH System (water heater installed null). | Sacramento | $29,000 |
| Aug 18, 2026 | Single Family | Reviewed by SolarApp+ 10kw Solar PV System, 0 kw PV Storage System Size and nullgal Solar WH System (water heater installed null). | Sacramento | $24,000 |
| Aug 6, 2026 | Single Family | Reviewed by SolarApp+ 9.2kw Solar PV System, 0 kw PV Storage System Size and nullgal Solar WH System (water heater installed null). | Sacramento | $21,000 |
| Jul 27, 2026 | Single Family | Reviewed by SolarApp+ 5.2kw Solar PV System, 11.5 kw PV Storage System Size and nullgal Solar WH System (water heater installed null). | Sacramento | $22,000 |
| Mar 23, 2026 | SolarApp | SolarApp ID: SA20260310-2133-79-9901-A; STC: 27 X 410W = 11.070KW PTC: 27 X 385.9W = 10.419KW (27) QCELLS Q.PEAK DUO BLK ML-G10.C+ 410 (410W) SOLAR MODULES (1) | Sacramento County | $35,000 |
| Feb 27, 2026 | Electrical | Install ess to existing system ***existing system bld23-01978*** (n) ess: (2) 13kwh sunvault sv-base-13-c (n) controller: 200a sunpower hub+ (n) backup loads pa | Placer County | — |
| Jan 13, 2026 | Electrical | E-permit: applicant's detailed description: like for like main panel relocation for gas clearance. 125a mpu; existing panel 125 amps - underground service, new | Stockton City | — |
Permit status
Where its permits stand, as the departments report them.
- Issued14
- Closed7
- Finaled3
- Not stated3
- Completed2
- Active1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.