Contractor · Electrical
PATRICE LESNIAK
30 building permits since 2024 in Buffalo city, NY — $1,185,590 in reported job value over 30 permits that state one.
- Building permits
- 30
- Reported job value
- $1.2M
- Active
- 2024–2026
- Latest permit
- Sep 23, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Buffalo city, NY30
Permits by year
By issue date (application date where there is none).
01020
18
202420252026*
View as tableHide table
| Year | Permits |
|---|---|
| 2024 | 3 |
| 2025 | 9 |
| 2026 (YTD) | 18 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Electrical1
Permit types
As the building departments classify them.
- SIGN30
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Sep 23, 2026 | SIGN | Replace existing ground sign with new illuminated ground sign for Elaine Panty Public Library Same place as existing sign is in.<div>*** Digeplan ***</div> | Buffalo City | $14,500 |
| Sep 22, 2026 | SIGN | Remove existing Marathon signage from fuel canopy and update with new. Also, 2 faces changes in existing fuel digit cabinet on the fuel canopy. *** Digepl | Buffalo City | $5,000 |
| Sep 9, 2026 | SIGN | Install (1) set of Illuminated channel letters on a raceway for Horizon Health Services Sign is replacing exact same size & copy as the existing sign. Exist | Buffalo City | $9,000 |
| Sep 1, 2026 | SIGN | Furnish and install (3) set of illuminated channel letters on 2 elevations of the building. *** Digeplan *** | Buffalo City | $15,000 |
| Sep 1, 2026 | SIGN | Remove existing signage on 2 elevations and install new signage *** Digeplan *** | Buffalo City | $6,000 |
| Aug 26, 2026 | SIGN | Remove existing Mobil on fuel canopy and add Marathon, (2) M logos & new fuel canopy panels.Pole sign, remove Mobil cabinet & install new Marathon cabin | Buffalo City | $10,000 |
| Jul 15, 2026 | SIGN | Exxon rebranding to Marathon. Face change in existing pole sign and and update existing fuel canopy, remove (3) readings of Exxon and installing (1) Marathon an | Buffalo City | $10,000 |
| Jul 14, 2026 | SIGN | Remove existing signage on 2 elevations, install with new updated signage. Engineering drawings to be uploaded when received. *** Digeplan *** | Buffalo City | $5,000 |
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.