Contractor · Electrical
ON POINT ELECTRIC
30 building permits since 2017 in Sacramento County, CA; Los Angeles city, CA and Seaside city, CA, across 10 counties — $333,834 in reported job value over 17 permits that state one.
- Building permits
- 30
- Reported job value
- $333.8K
- Active
- 2017–2026
- Latest permit
- Oct 15, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Sacramento County, CA7
- Los Angeles city, CA6
- Seaside city, CA3
- Riverside city, CA2
- Stockton city, CA2
- Kings County, CA1
- Citrus Heights city, CA1
- Elk Grove city, CA1
- Fremont city, CA1
- Hayward city, CA1
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2017 | 1 |
| 2018 | 2 |
| 2019 | 1 |
| 2020 | 1 |
| 2021 | 1 |
| 2022 | 9 |
| 2024 | 2 |
| 2025 | 5 |
| 2026 (YTD) | 8 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Electrical23
- Solar12
- Battery storage4
- Roofing1
- Plumbing1
- Water heaters1
- Electric meters1
- New construction1
Permit types
As the building departments classify them.
- Electrical11
- SolarApp4
- Electrical Permit3
- Residential2
- SLCR2
- 340-R1
- BLDG - Electrical (R)1
- BL, EL, CH1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Oct 15, 2026 | SolarApp | SolarApp ID: SA20261015-2133-622-13704-A; 8.8 KW PV + ESS | Sacramento County | $50,160 |
| Oct 9, 2026 | SolarApp | SolarApp ID: SA20261009-2133-613-13704-A; 3.96 KW PV + ESS + 100A MPU | Sacramento County | $36,444 |
| Jul 7, 2026 | SolarApp | SolarApp ID: SA20260707-2133-292-13704-A; 8.8 KW PV + ESS | Sacramento County | $50,880 |
| Mar 30, 2026 | Electrical | E-permit: solar app application id - sa20260330-150-202-13704-a, residential - 12.76kw photovoltaic system main breaker replacement: - no, battery backup units: | Stockton City | — |
| Mar 24, 2026 | BL, EL, CH | BLDG26-16952: INSTALL ENERGY STORAGE SYSTEM (15 KWH) FOR EXISITING PHOTOVOLTAIC SYSTEM AT EXTERIOR OF RESIDENCE | Mountain View City | $1,000 |
| Mar 24, 2026 | Electrical | 6.6 kw pv array - solar only | Fremont City | — |
| Jan 12, 2026 | Electrical | E-permit: applicant's detailed description: adding ess to an existing roof mounted pv array; existing panel 125 amps - overhead service. | Stockton City | — |
| Jan 5, 2026 | Electrical | 6.83 kw roof mount pv w/ eg4 ess | Hayward City | — |
Permit status
Where its permits stand, as the departments report them.
- Not stated11
- Issued6
- Finaled5
- Active3
- Closed3
- Expired1
- Completed1
Also on file as
The same name elsewhere
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.