Contractor · HVAC
Dmitriy Gorbachev
30 building permits since 2019 in Wellesley town, MA; Arlington town, MA and Somerville city, MA, across 4 counties — $437,264 in reported job value over 27 permits that state one.
- Building permits
- 30
- Reported job value
- $437.3K
- Active
- 2019–2026
- Latest permit
- Oct 30, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Wellesley town, MA7
- Arlington town, MA4
- Somerville city, MA4
- Lexington town, MA3
- Walpole town, MA3
- Concord town, MA2
- Quincy city, MA2
- Easton town, MA1
- Cohasset town, MA1
- Foxborough town, MA1
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2019 | 1 |
| 2021 | 4 |
| 2022 | 7 |
| 2023 | 7 |
| 2024 | 1 |
| 2025 | 6 |
| 2026 (YTD) | 4 |
Type of work
Permits describing each kind of work; one permit can cover several.
- HVAC27
- Kitchens5
- Heat pumps5
- Bathrooms3
- Accessory dwelling units1
- Gas1
- Remodels1
Permit types
As the building departments classify them.
- Sheet Metal Permit8
- SHT MTL5
- Mechanical/Sheet Metal Permit-Residential ( 1 and 2 Family)3
- Mechanical Permit Application2
- Sheet Metal2
- Sheet Metal Permit **(EXISTING ductwork modification ONLY)**2
- Building Permit Application1
- MECH1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Oct 30, 2026 | Mechanical/Sheet Metal Permit-Residential ( 1 and 2 Family) | Installation of central air HVAC system for ADU | Walpole Town | $12,000 |
| Sep 8, 2026 | Mechanical/Sheet Metal Permit-Residential ( 1 and 2 Family) | Installation of two Central Air HVAC systems with ductwork | Walpole Town | $35,000 |
| Apr 23, 2026 | Mechanical Permit Application | Installation of ERV system | Arlington Town | $1,000 |
| Apr 23, 2026 | Sheet Metal Permit **(EXISTING ductwork modification ONLY)** | Installation of ductwork for 3rd floor from the existing HVAC system. Installation of one ERV system. | Arlington Town | $6,200 |
| Sep 9, 2025 | Sheet Metal | Installation of ductwork for the finished basement of the existing HVAC system | Lexington Town | $8,000 |
| Sep 2, 2025 | Mechanical Permit Application | Installation of gas furnace with heat pump system with ductwork | Arlington Town | $10,000 |
| Sep 2, 2025 | Sheet Metal Permit **(EXISTING ductwork modification ONLY)** | Installation of one HVAC system with ductwork for heating and air conditioning | Arlington Town | $17,500 |
| Aug 14, 2025 | Building Permit Application | Installation of new furnace/AC and New ductwork for the 1st floor.due to storm damage. | Quincy City | $7,500 |
Permit status
Where its permits stand, as the departments report them.
- Completed14
- Active7
- Issued5
- Closed2
- Expired1
- Finaled1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.