Contractor · Electrical

Bridges Byran Damien

30 building permits since 2021 in Orleans Parish, LA.

Building permits
30
Reported job value
—
Active
2021–2023
Latest permit
Aug 21, 2023

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Orleans Parish, LA30

Permits by year

By issue date (application date where there is none).

012.525
23
202120222023
View as table
YearPermits
20211
20226
202323

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical20
  • HVAC9
  • Plumbing4
  • Kitchens3
  • Water heaters3
  • Electric meters3
  • Pools & hot tubs3
  • Remodels1
  • Additions1
  • Bathrooms1

Permit types

As the building departments classify them.

  • Renovation (Non-Structural)1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Aug 21, 2023—Install 3 ton AC unit .Orleans Parish—
Aug 21, 2023—Install 3 ton AC unit.Orleans Parish—
Aug 15, 2023—Install 5 ton AC unit, tankless water heater and kitchen hood.Orleans Parish—
Aug 15, 2023—Install 5 ton AC unit , tankless water heater and kitchen hood.Orleans Parish—
Aug 3, 2023—Electrical Vacancy InspectionOrleans Parish—
Jul 28, 2023—Remove and replace furnace, coil, and condenser unit.Orleans Parish—
Jul 10, 2023—Run wire and flexible conduit from main breaker to pool control panel , install 60 amp breaker, ground pool equipment and install disconnect .Orleans Parish—
Jul 6, 2023—Split electrical and add separate service.Orleans Parish—

Permit status

Where its permits stand, as the departments report them.

  • Not stated14
  • C/o issued14
  • Expired2

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.