Contractor · Plumbing

LCS SITE SERVICES

367 building permits since 2019 in Arlington County, VA.

Building permits
367
Reported job value
—
Active
2019–2026
Latest permit
Oct 16, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Arlington County, VA367

Permits by year

By issue date (application date where there is none).

050100
83
2020202220242026*
* 2026 is year to date.
View as table
YearPermits
201910
202039
202126
202283
202363
202433
202573
2026 (YTD)40

Type of work

Permits describing each kind of work; one permit can cover several.

  • Plumbing330
  • Grading & excavation183
  • Demolition16
  • Fire sprinklers5
  • New construction5

Permit types

As the building departments classify them.

  • Plumbing174
  • Excavation ROW133
  • Transportation ROW - with excavation50
  • Amendment4
  • Fire3
  • Work in ROW3

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Oct 16, 2026Excavation ROWCut 6 water main and install 6x4 tee with 4 gate valve, install 4 DIP CL53 polywrapped water line to 4 valve going to fireline to transition to the 1.5 firelineArlington County—
Oct 16, 2026Transportation ROW - with excavationCut 6 water main and install 6x4 tee with 4 gate valve, install 4 DIP CL53 polywrapped water line to 4 valve going to fireline to transition to the 1.5 firelineArlington County—
Oct 15, 2026PlumbingWater and sewer disconnect outside of ROW for future demo of SFDArlington County—
Sep 22, 2026PlumbingWater service reconnect and sewer lateral reconnect outside ROWArlington County—
Aug 19, 2026Transportation ROW - with excavationCut 6 water main and install 6x4 tee with 4 gate valve, install 4 DIP CL53 polywrapped water line to 4 valve going to fireline to transition to the 1.5 firelineArlington County—
Aug 19, 2026Transportation ROW - with excavationCut 6 water main and install 6x4 tee with 4 gate valve, install 4 DIP CL53 polywrapped water line to 4 valve going to fireline to transition to the 1.5 firelineArlington County—
Aug 18, 2026Excavation ROWCut 6 water main and install 6x4 tee with 4 gate valve, install 4 DIP CL53 polywrapped water line to 4 valve going to fireline to transition to the 1.5 firelineArlington County—
Aug 18, 2026Excavation ROWCut 6 water main and install 6x4 tee with 4 gate valve, install 4 DIP CL53 polywrapped water line to 4 valve going to fireline to transition to the 1.5 firelineArlington County—

Permit status

Where its permits stand, as the departments report them.

  • Finaled171
  • Pending81
  • Pending payment49
  • Closed47
  • Additional information required11
  • Approved2
  • Completed2
  • Withdrawn2

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.