Contractor · Plumbing

RAPID ROOTER PLUMBING COMPANY

31 building permits since 2022 in Howard County, MD and Rockville city, MD, across 2 counties.

Building permits
31
Reported job value
—
Active
2022–2026
Latest permit
Oct 21, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Howard County, MD30
  • Rockville city, MD1

Permits by year

By issue date (application date where there is none).

07.515
13
20222023202420252026*
* 2026 is year to date.
View as table
YearPermits
20221
20234
20243
202513
2026 (YTD)10

Type of work

Permits describing each kind of work; one permit can cover several.

  • Plumbing30
  • Remodels11
  • Additions11
  • Gas8
  • Bathrooms8
  • Water heaters5
  • Kitchens3
  • Electrical1

Permit types

As the building departments classify them.

  • Express Plumbing Permit16
  • Residential Plumbing Addition Alteration Permit11
  • Residential New Plumbing Permit3

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Oct 21, 2026Residential New Plumbing PermitNOV/Replace fixtures for all existing bathrooms, kitchen, laundry and hose bibs (23 total fixtures). Details: Basement: Single Vanity, Toilet, Shower, Water HeaHoward County—
Aug 10, 2026Express Plumbing Permitreplace check valve 3" in basement bathroom relocate to hallway to make assessableHoward County—
Aug 10, 2026Express Plumbing Permitreplace water heater 50 gal electricHoward County—
Aug 10, 2026Express Plumbing Permitreplace gas waterheater install expansion a\tank and panHoward County—
Aug 7, 2026Residential Plumbing Addition Alteration Permitmeter upgrade from 1/2" to 3/4" - service to manifold upgrade from 1/2' -3/4' also add a gas dryer to existing manifoldHoward County—
Jul 30, 2026Express Plumbing Permitreplace gas cock on gas dryerHoward County—
Jul 14, 2026Express Plumbing Permitground work for main sewer service at foundation wall main stack through floor to horizontal 4" sewer service extending through foundation to county connection Howard County—
Jul 7, 2026Residential Plumbing Addition Alteration Permitreconstruct water waster for 2-vanities master bathroom 1-existing tub, move 1-kitchen sink water waste to make 1-island sink and 1-dishwasher move and replace Howard County—

Permit status

Where its permits stand, as the departments report them.

  • Completed22
  • Issued4
  • Cancelled3
  • Closed1
  • Additional information required1

Also on file as

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.